CAUTION:
PLEASE FOLLOW THIS INSTRUCTION MANUAL CAREFULLY TO
PREVENT ANY INJURIES OR COMPLICATIONS THAT MAY ARISE.
WARNING:
Before installing or maintaining the luminary, make sure all powers are
TURNED OFF
.
Verify that supply voltage is correct by comparing it with the label information on all
fixtures.
Make all connections in accordance with the NEC requirements, and make sure all
luminaries are properly secured to prevent any wire complications. This luminary is
to always be installed with the lens facing down and its not to exceed the maximum
ambient temperature rating noted on the specification sheet.
USFLxxxWPL (280W-600W)
LED Flood Light
STANDARD INSTALLATION STEPS
3. There should be two cables sticking out
of the back of the fixture in order for it to
be installed. Remove the two PVC pipe
elbows from the fixture. The purpose of these
elbows is to protect the cable during shipping.
4) The cable with three wires is the LED
Driver Input cable used to connect to the AC
Power Supply Cord. Follow the wiring
diagram below in order to properly connect
the wires. If a 0-10V dimmer is being installed
with this luminaire. Use the cable on the left
hand side to do so. This cable will be labeled
with two wires as DIM+ and DIM-.
LED DRIVER
V(-)
[BLACK]
V(+)
[RED]
TO LOAD
[LED BOARD]
[WHITE]
ACN [BLUE/WHITE]
ACL [BROWN/BLACK]
GROUND [GREEN]
NEUTRAL [WHITE]
GROUND [GREEN]
HOT [BLACK]
INPUT
OUTPUT
DIM
WHITE (-)
BLUE(+)
Inside J-Box
PRE-CONNECTED
(DO NOT
DISCONNECT)
[BLACK]
Using a J-Box (not included), Connect the ACL and the ACN from the driver to the conduit with the AC Power Supply cords.Follow the Wiring Diagram provided.
* LED DRIVER Input Ground (green) wire only available for selected fixtures.
If the Ground Wire is missing and the Power Supply includes a ground wire, connect the power supply ground wire to the fixture.
(FOR DIMMABLE VERSION)
5. Run the power cord from the
trunnion mount to the F2SB luminaire,
Once the cable has been inserted
inside the F2SB, connect the power
cable to the LED Driver inside the F2SB.
In order to access the LED Driver
cables, the electrician must first
remove the [6] screws from the
service door using a #2 Phillips
screw driver and make all
connections inside the luminaire.
6. Once all wiring is complete,
Close the service door and use
the M12 bolt to fasten the
Trunnion Mount to the F2SB.
Do not fasten completely.
1. Depending on the model number, the FFH will determine which Trunnion Mount hole dimensions will have to be followed.
12.64 in
16.51 in
20.29 in
25.28 in
1.89 in
.63 in
.43 in
.63 in
.63 in
.43 in
.43 in
20.87 in
9.45 in
.71 in
1.89 in
.71 in
18.9 in
26.97 in
9.45 in
.71 in
USFL280WPL
USFL400WPL
USFL600WPL
2. Use the bolts provided in order to fasten the Trunnion mount on to the mounting
surface. It is very crucial to have an authorized engineer verify the safety of the
Flood Light to be installed in a safe location to prevent any injuries. Loosen
the bolt
on the side of the fixture in order to adjust the angle of tilt that is required
for the
application.
Installation Sheet