CAUTION:
PLEASE FOLLOW THIS INSTRUCTION MANUAL CAREFULLY TO
PREVENT ANY INJURIES OR COMPLICATIONS THAT MAY ARISE.
WARNING:
Before installing or maintaining the luminary, make sure all powers are
TURNED OFF
.
Verify that supply voltage is correct by comparing it with the label information on all
fixtures.
Make all connections in accordance with the NEC requirements, and make sure all
luminaries are properly secured to prevent any wire complications. This luminary is
to always be installed with the lens facing down and its not to exceed the maximum
ambient temperature rating noted on the specification sheet.
USSLxxxWPL
Series LED Area Light
Installation Sheet
STANDARD INSTALLATION STEPS
Photocell
AC2SBPS
LED Driver
BLA
CK (L)
WHITE (N)
RED WIRE
TO LOAD
[LED BOARD]
V(-)
[BLACK]
V(+)
[RED]
N
[WHITE]
L
[BLACK]
N [WHITE]
L [BLACK]
A
C PO
WER
PART NO.
IMAGE
DESCRIPTION
QTY
AC2SBPS-A
(Base)
This base is the part that gets wired to
the
fixture
using the wiring diagram.
1
AC2SBPS-B
(Cell for LV)
AC2SBPS480-B
(Cell for HV)
Once the base is wired and fastened onto
the luminaire, this part is inserted and twist-
locked into place.
(This installation is for one of the two photocells noted)
1*
10-00066
Flathead Machine Screw are used to fasten
the AC2SBPS-BASE on top of the
l
uminaire.
2
1. Using a Phillips Screw Driver, remove the 4 Flathead machine screws that hold
the cap in place and remove the cap and the gasket.
2. A qualified electrician is required to perform the
electrical wiring in compliance with the National
Electrical Code (NEC) and other local codes which
may be required. Use the Wiring Diagram on the
right-hand side in order to see how the cables must
be connected. This will require the electrician to
remove the screws holding the service door to
reach in and get all the cables from the LED Driver.
3. Once all the wiring is complete, fasten the
AC2SBPS base onto the service door using the [2]
Flathead machine screws provided. Make sure
to orient the marked arrow on the base to make it
face NORTH. This is critical in order for the
photocell to work properly.
WIRING
DIAGRAM
4. Once the AC2SBPS base is installed, insert the AC2SBPS Photocell and twist-lock
it into place. Once again, it is critical to make sure the opening of the cap is facing
NORTH.
NORTH
NOR
TH
(FOR DIMMABLE
VERSION)
WHITE (-)
BL
UE(+)
0-10 V DIMMING