When carrying out final adjustments in the levelling
of the chassis it is important that the last operation
on each Outrigger be an extension. This is to avoid
creating a reduced hydraulic pressure within the
Outriggers and hence negate the possibility of
minor settling.

ELEVATING & LOWERING THE TL33
WORK PLATFORM

When the TL49 has been thoroughly inspected, and has
been set up in accordance with the correct Outrigger
Deployment procedures, the Elevating Assembly can then
be used.

LOOK up and around for obstructions before
performing the lift function.

ENSURE that the Elevating Assembly is clear of
the Chassis before engaging the Slew operation.

DO NOT overload the platform

DO NOT operate within 10 feet (3 metres) of any
electrical power cables. THIS WORK
PLATFORM IS NOT INSULATED.

Cordon off the area within the platform’s working
area to keep passers-by clear of  the booms.

NOTE: Chassis controls are for service use only.

1.

Enter the Platform through the entrance provided
and ensure that the Drop Bar is in position. Where
applicable lock the Entry Step in the raised position.

2.

Before using the machine all local Safety
Regulations involving helmets and restraining
devices should be observed. Safety harness
lanyards, not exceeding 1 m in length, should be
attached to the anchor points on the Platform floor.

3.

Ensure the ‘ON/OFF/OVERRIDE’ switch on
the Upper Control Box switch is turned to the 

ON

, the Keyswitch on the Outrigger Control Box is
turned to 

CHASSIS

 position and all Emergency

Stop Buttons are 

OFF 

(twisted clockwise).

4.

Check the green “System OK” L.E.D. is

WARNING

DANGER

illuminated. If not, and/or an audible alarm sounds,
check that the Outriggers are correctly deployed and
that the machine is level. The boom functions, nor
the slew function will operate if this is not correct.

5.

Select “Boom 1” on the Function Selector Switch.
Check for overhead obstructions and when satisfied
squeeze the red Interlock control on the Joystick.
Slowly move the Joystick forward to elevate
Boom 1. The further the joystick is moved, the
faster the boom will move. Pressure must be applied
to the Interlock at all times while operation is
required.

6.

Select “Boom 2”, “Telescope” or “Rotate” as
required using the ‘Function Selector Switch’ and
operate as described above. For boom one or two
functions the controls will be forward for UP and
backward for DOWN. For telescope retract the
Controller Joystick should be moved forward and for
rotate Telescope extend move the Controller
Joystick backward. To rotate (Slew) RIGHT the
Controller Joystick should be moved forward and to
rotate (Slew) LEFT move the Controller Joystick
backward.

7.

Before lowering, check beneath the Platform floor
for obstructions. Operate as described above,
moving the Joystick to lower the Booms.

LEVELLING

NOTE:
The Cage Levelling function will only work when the
Boom Rest Limit Switch has been activated i.e. when
the Booms are stowed.

The platform can be levelled from the Upper controls using
the levelling switch (See Figure 1). To activate this switch
the ‘ON/OFF/OVERRIDE’ switch, also located on the
Upper Control Box, must be held to the 

OVERRIDE

position.
This switch is for fine adjustment of the slave levelling
cylinder. Care should be taken when performing this
operation. The switch should be operated cautiously to
level the cage 

slowly.

 Activate the switch in a careful,

controlled manner.

EMERGENCY SITUATIONS &
EMERGENCY OVERRIDE

In any emergency situation, the first action to be taken
should be to hit the red “Emergency Stop” button. This will
give instant cutout of all functions. It will then be required
to twist the button clockwise to release before the machine
can be operated again.

Содержание TL49

Страница 1: ...loads or forces NEVER change or modify operating or safety systems INSPECT the machine thoroughly for missing decals cracked welds loose hardware hydraulic leaks damaged cables loose wire connections or wheel bolts NEVER use damaged equipment Contact UpRight Irl Ltd for instructions NEVER climb down an elevating assembly with the platform elevated NEVER use this machine unless the platform entranc...

Страница 2: ... Toggle Switches until the Outrigger Foot Pads come into contact with the surface See Figure 1 Care should be exercised that the Foot Pads are orientated correctly When all four Outriggers are in contact with the surface the Chassis can then be elevated This should be done by extending each Outrigger one at a time in small increments until both of the Road Wheels have just cleared the ground 11 Th...

Страница 3: ...a colleague to activate the Tilt Sensor The alarm should sound and normal controls should cease By turning the Platform Selector Switch to the Emergency Override position the DOWN functions RETRACT functions and SLEW functions only will be activated The Emergency Override functions should also give the Down Slew functions only when an Outrigger Limit Switch is deactivated Carry out the tests as ou...

Страница 4: ...held to the Emergency Override Position 14 EMERGENCY STOP SWITCH Push red button to cut off power to all functions OFF Turn clockwise to release and restore power 3 JOYSTICK CONTROL LEVER Squeeze the Interlock Switch coloured red This will activate the controller T o activate the BOOM1 UP BOOM2 UP TELESCOPE 8 EMERGENCY STOP SWITCH Push red button to cut off power to all functions OFF Turn clockwis...

Страница 5: ... activated When the Keyswitch is in the CHASSIS position and the Outriggers are properly deployed there should be no warning alarm DANGER WARNING Before operating the TL49 Work Platform it is imperative that the Pre Operation Inspection has been completed and any deficiencies have been corrected The operator must also be fully trained on this machine TOWING BeforeTowing ensurethattheElevatingAssem...

Страница 6: ...ew function will operate if this is not correct 5 Select Boom 1 on the Function Selector Switch Check for overhead obstructions and when satisfied squeeze the red Interlock control on the Joystick Slowly move the Joystick forward to elevate Boom 1 The further the joystick is moved the faster the boom will move Pressure must be applied to the Interlock at all times while operation is required 6 Sel...

Страница 7: ...pe Operate the lower boom first by pushing turning anticlockwise slowly until the boom starts to descend The speed of descent iscontrolled by the amount the valve is pushed turned anticlockwise ensure that the rate of descent is kept slow and under control Descent can be halted at any time by removing pressure from the red knob for the PUSH type or turning the TWIST type clockwise Repeat the opera...

Страница 8: ...L49 Work Platform These should only be used when no operator is in the Platform for maintenance service or inspection purposes or if the operator has become incapacitated 2 It should be noted that in order to activate any of the Lower Control Toggle Switches on the Lower Control Box the Keyswitch located on the Outrigger Control Box must be turned anticlockwise to the CHASSIS position 3 Use the ap...

Страница 9: ...ttach the Breakaway Safety Cable to the towing vehicle The TL49 may then be towed CAUTION z the towing vehicle will support too much weight if the Towhitch is too low If the TL49 is to be transported by other means then it must be securely tied down to the transporting unit at several points Recommended securing points are the four outrigger support members on the Chassis and the Tow Bar Weldment ...

Страница 10: ...ems must first be checked 1 Correct voltage and current available to the charger WARNING 2 Extension cord is in good condition is no longer than 26 ft 8 m and is 12 ga 1 5 mm2 or larger 3 Charger will have an adequate time to allow a full charge i e ensure that power supply will not be switched off overnight 4 A C Voltage Selector Switch 110 220V is in the correct position All UpRight battery oper...

Страница 11: ...oad Check all trailer lights and Daily Lights connecting plug Brake Apply handbrake and check Daily function Check brake shoes for wear 50h 30d Test auto reverse function 50h 30d Adjust brake shoes 50h 30d ROUTINE SERVICE Use the following table as a guide for routine maintenance Inspection and maintenance shall be performed by personnel who are trained and familiar with mechanical and electrical ...

Страница 12: ...57427 000 2 REQUIRED 057418 000 4 REQUIRED 057421 000 2 REQUIRED 058534 000 2 REQUIRED 058532 000 1 REQUIRED 058533 000 2 REQUIRED 057424 000 3 REQUIRED 057416 000 2 REQUIRED 057385 000 8 REQUIRED 057429 000 2 REQUIRED 057430 000 2 REQUIRED 058536 000 1 REQUIRED 058535 000 2 REQUIRED 057382 000 2 REQUIRED 058761 000 1 REQUIRED 058760 000 2 REQUIRED 058539 000 1 REQUIRED 058011 000 1 REQUIRED 05801...

Страница 13: ...ED 057425 001 1 REQUIRED 057426 000 1 REQUIRED 057420 000 1 REQUIRED 057434 000 1 REQUIRED NOT SHOWN BOOM LOCK PIN 058992 000 1 REQUIRED 057432 000 2 REQUIRED 057422 000 2 REQUIRED NOT SHOWN MOS90 DECAL 057387 000 1 REQUIRED 058760 000 2 REQUIRED 057417 010 4 REQUIRED 057431 001 1 REQUIRED 058802 000 1 REQUIRED 058012 000 1 REQUIRED 058538 000 1 REQUIRED 058080 000 1 REQUIRED 057424 000 3 REQUIRED...

Страница 14: ...14 Notes ...

Страница 15: ...15 Notes ...

Страница 16: ...16 ...

Отзывы: