background image

11

Maximum Distrib

uted

Platf

orm Load 2000 lbs

or 5 occupants

Maximum side load 300 lbs

Maximum Distrib

uted

Platf

orm Load 1500 lbs

or 5 occupants

Maximum side load 250 lbs

Maximum Wheel

And/Or Outrigger

Load 3900 lbs.

101252-013

1 REQ

. LX31

Maximum Wheel

And/Or Outrigger

Load 4200 lbs.

101252-014

1 REQ

. LX31

LX SERIES LABEL INSTALLATION: THESE LABELS SHALL BE PRESENT AND IN GOOD

CONDITION BEFORE OPERATING THE WORK PLATFORM. BE SURE TO READ,

UNDERSTAND AND FOLLOW THESE LABELS WHEN OPERATING THE WORK

PLATFORM.

Note:

Labels can be ordered by using Part Number located by each label. For 

machines 

equipped 

with 

options 

consult 

Service 

Manual.

67638-002 1-REQUIRED

BI-ENERGY 

MODELS 

ONLY

66555-000 1-REQUIRED

66551-002 1-REQUIRED

66555-000 1-REQUIRED

62562-002 1-REQUIRED

66558-000 2-REQUIRED

66561-001 1-REQUIRED

27898-000 1-REQUIRED

BI-ENERGY 

 MODELS 

ONLY

66568-000 1-REQUIRED

66552-000 1-REQUIRED

66550-009 1-REQUIRED

66554-000-00 1-REQUIRED

61515-001 1-REQUIRED

67642-002 1-REQUIRED

10076-001 1-REQUIRED

66562-001 1-REQUIRED

61205-000 1-REQUIRED

61220-001 1-REQUIRED

63423-000 1-REQUIRED

60197-000 1-REQUIRED

66551-003 1-REQUIRED

66558-000 2-REQUIRED

67639-001 1-REQUIRED

66557-010

2-REQ. 

LX31 

ONLY

66557-007

2-REQ. 

LX41 

ONLY

All manuals and user guides at all-guides.com

all-guides.com

Содержание LX Bi-Energy

Страница 1: ...er mounting platform KEEP all body parts clear of outriggers when extending or retracting outrigger equipped machines only NEVER use ladders or scaffolding on the platform NEVER attach overhanging loads or increase platform size MAINTAIN tire pressure at 50 psi Check daily LOOK up down and around for overhead obstructions and electrical conductors DISTRIBUTE all loads evenly on the platform See th...

Страница 2: ...tes freely and latches securely 7 Check tires for damage Check tire pressure 75 psi 5 2 bar if equipped with pneumatic tires 8 Carefully inspect the entire work platform for damage such as cracked welds or structural members loose or missing parts oil leaks damaged cables or hoses and loose connec tions 9 Bi Energy models While the engine is cool check the engine coolant level NEVER remove the cap...

Страница 3: ...elevate and or there is no alarm STOP and remove the machine from service until it is repaired 9 Release the tilt sensor and fully elevate platform Figure 2 Controller 10 Visually inspect the elevating assembly lift cylinder cables and hoses for damage or erratic operation Check for missing or loose parts 11 Lower the platform partially by pushing in on the chassis lower switch and check operation...

Страница 4: ... platform ensure that the pre operation and safety inspection has been completed any deficiencies have been corrected and the operator has been thoroughly trained on this machine NOTE Bi Energy machine may be powered by batteries or by engine To power the machine by engine press engine start button to crank the engine Release button when engine starts If engine is cold press the glow plug button o...

Страница 5: ... could result Travel with Work Platform Elevated Travel with platform elevated ONLY on firm and level surfaces Note The work platform will travel at reduced speed when in the elevated position and only when the front axle is parallel with the rear axle 1 Check that the route is clear of persons ob structions holes and drop offs surface is level and capable of supporting the wheel loads 2 Check cle...

Страница 6: ...he side guardrails 3 Raise rear guardrail assembly aligning holes and install bolts washers and nuts 4 Raise front guardrail aligning holes and install bolts washers and nuts 5 Hang controller on front guardrail 6 Before operating work platform check that all fasteners are in place and properly torqued Before operating machine guardrails must be securely fastened in their proper position Double De...

Страница 7: ...hart on page 10 1 Raise front guardrail making sure it is pushed down to secure the guardrail in the vertical position Repeat for rear guardrail 2 Raise guardrails making sure each is pushed down to secure the guardrail in the vertical position Align holes and install hardware 3 Raise one of the four slide out deck side guard rail assemblies Align holes and install hardware Repeat this procedure f...

Страница 8: ...2 Rotate scissors brace clockwise until the locking pin engages Verify locking pin is engaged 3 Lower platform completely Battery Maintenance Hazard of explosive gas mixture Keep sparks flame and smoking materials away from batteries Always wear safety glasses when working with batteries Battery fluid is highly corrosive Rinse away any spilled fluid thoroughly with clean water Always replace batte...

Страница 9: ...eration Daily Control Checktheexteriorofthecable Daily Cable forpinching bindingorwear Platform Checkfastenersforpropertorque Daily Deckand Checkweldsforcracks Daily Rails Checkconditionofdeck Daily Tires Checkfordamage Daily Checkairpressure 75psi 5 2bar Daily Check lug nuts torqueto150ft lbs 205Nm 30D Hydraulic Wipeclean 30D Pump Checkforleaksatmatingsurfaces 30D Checkforhosefittingleaks Daily C...

Страница 10: ...10 NOTES All manuals and user guides at all guides com ...

Страница 11: ...Part Number located by each label For machines equipped with options consult Service Manual 67638 002 1 REQUIRED BI ENERGY MODELS ONLY 66555 000 1 REQUIRED 66551 002 1 REQUIRED 66555 000 1 REQUIRED 62562 002 1 REQUIRED 66558 000 2 REQUIRED 66561 001 1 REQUIRED 27898 000 1 REQUIRED BI ENERGY MODELS ONLY 66568 000 1 REQUIRED 66552 000 1 REQUIRED 66550 009 1 REQUIRED 66554 000 00 1 REQUIRED 61515 001...

Страница 12: ...6 m x 1 73 m 228 in x 68 in 5 79 m x 1 73 m 2000 lbs 907 kg 2000 lbs 907 kg 500 lbs 227 kg 1750 lbs 795 kg 500 lbs 227 kg 8 people 2 people 8 people 2 people 37 ft 11 28 m 31 ft 9 45 m 56 3 in 1 43 m 2WD 9 920 lbs 4 500 kg 2WD 10 120 lbs 4 590 kg 2WD 10 350 lbs 4 695 kg 2WD 10 550 lbs 4 785 kg 2WD 10 780 lbs 4 890 kg 2WD 10 980 lbs 4 981 kg 90 in 2 29 m 99 75 in 2 53 m 160 5 in 4 08 m 31 ft 9 45 m...

Отзывы: