Transportation
TL50 Service & Parts
Page 11
Care should always be taken while towing the TL50 on an uneven or sloped surface. It is recommended
that the set of procedures that follow should be incorporated into a normal working practice for towing the
TL50 Work Platform. The Procedures which should be followed when transporting the TL50 are
1.The Platform is to be fully lowered, retracted and slewed in the correct position.
2.The Platform is to be securely stowed by closing the boom lockdown.
3.The Jockey Wheel that is fitted to the Towhitch is to be extended until the Receiver is close to the height
of the vehicle’s tow bar.
4.The Hand Brake is pulled to engage the brakes (important if the machine is not on a level surface).
5.The Outriggers are to be fully retracted and secured in position.
6.The key is turned to the off position.
7.Move the vehicle as close as possible to the Receiver.
8.Lift the Towhitch on to the tow bar and make sure the Receiver is properly secured.
9.Release the Hand Brake and retract the Jockey Wheel.
It is important that the Jockey Wheel is retracted as fully as possible so that the wheel will not slew (turn)
while being transported. Failure to do so could result in damage to the Jockey Wheel.
10.The tailboard harness is connected to the vehicle’s braking system by means of a 7 Pin Plug.
11.Attach the Breakaway Safety Cable to the towing vehicle.
The TL50 may then be towed.
If the TL50 is to be transported by other means then it must be securely tied down to the transporting unit
at several points.
Recommended securing points are the four outrigger support members on the Chassis and the Tow Bar-
weldment. Further securing points should be used if the terrain on which the unit is travelling is rough or
uneven. Care should be taken when using tie downs that sensitive parts of the TL50 (i.e. hosing, cabling
etc.) are not affected.
ALWAYS ensure that the Hand Brake is fully applied, that all the booms are FULLY stowed and that the
Boom Lock Down Pin is in place.
Содержание 503502-000
Страница 1: ...ERVICE PARTS MANUAL POWERED ACCESS WORK PLATFORM TL50...
Страница 21: ...Page 16 TL50 Service Parts Specifications Notes...
Страница 51: ...Page 3 30 Maintenance 3 19 Torque Specifications TL50 Service Parts NOTES...
Страница 59: ...Page 5 2 Schematics 5 1 Introduction TL50 Service Parts...
Страница 60: ...Page 5 3 Schematics 5 1 Introduction TL50 Service Parts...
Страница 61: ...Page 5 4 Schematics 5 1 Introduction TL50 Service Parts...
Страница 62: ...Page 5 5 Schematics 5 1 Introduction TL50 Service Parts...
Страница 63: ...Page 5 6 Schematics 5 1 Introduction TL50 Service Parts Notes...
Страница 66: ...Page 6 3 Illustrated Parts Breakdown General Assembly TL50 Service Parts 1 1 2 3 4 5 6 7...
Страница 68: ...Page 6 5 Illustrated Parts Breakdown Chassis Assembly TL50 Service Parts Chassis Assembly 503001 000...
Страница 70: ...Page 6 7 Illustrated Parts Breakdown Booms Posts Assembly TL50 Service Parts 44 45...
Страница 72: ...Page 6 9 Illustrated Parts Breakdown Platform Assembly Standard TL50 Service Parts...
Страница 74: ...Page 6 11 Illustrated Parts Breakdown Platform Assembly Rotator TL50 Service Parts...
Страница 88: ...Page 6 25 Illustrated Parts Breakdown Hydraulic Tank Assembly TL50 Service Parts...
Страница 90: ...Page 6 27 Illustrated Parts Breakdown Electrical Assembly TL50 Service Parts...
Страница 92: ...Page 6 29 Illustrated Parts Breakdown Hydraulic Assembly TL50 Service Parts...
Страница 94: ...Page 6 31 Illustrated Parts Breakdown Decal Assembly TL50 Service Parts...
Страница 95: ...Page 6 32 Illustrated Parts Breakdown Decal Assembly TL50 Service Parts...
Страница 96: ...Technician s Print TL50 W ork Platform Electrical Schematic...
Страница 97: ...Technician s Print TL50 W ork Platform Harness Schematic...
Страница 98: ......