6 Finishing installation
Warning!
Leaking connections can cause personal injury and
property damages.
Note
Install the pipes in accordance with planning
documentation.
To ensure proper functionality for the heating system, do not reduce
the specified cable cross-sections. Use black adapters to connect the
heat meter.
If the fittings are not to be replaced with optional components, replace
the plastic fittings with stainless steel
1.4401
pipes. Contact
manufacturer for more information.
•
Connect the hydraulics correctly.
•
When connecting the pipes, use the supplied seals.
•
Connect the heating supply, heating return and the hot and cold
water.
•
Install a filling and draining valve on site at a suitable central
point to fill the central heating system.
•
Observe the hydraulic diagram as an installation guide example.
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 4.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 5.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 5.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 5.0 kW
WK 1M, 15 l/min
1059 l/h, 42.2 kW, HZ 5.0 kW
TS A 1
DN 25
TS A 2
DN 32
TS A 3
DN 32
TS A 4
DN 32
3. Floor
TS Z 3
DN 32
TS Z 2
DN 40
TS Z 4
DN 40
TS Z 5
DN 32
TS A 1
DN 25
TS A 2
DN 32
TS A 3
DN 32
TS A 4
DN 32
TS A 1
DN 25
TS A 2
DN 32
TS A 3
DN 32
TS A 4
DN 32
TS A 1
DN 25
TS A 2
DN 32
TS A 3
DN 32
TS A 4
DN 32
TS Z 1
DN 50
CD0000264
3
2
1
0
3
2
1
0
6.1 Visual inspection
Caution!
Improper commissioning can lead to property damage.
Note
If an installation error is found during visual inspection,
temporarily stop commissioning and rectify the error.
Complete commissioning by following these steps:
1.
Make a complete check up of the installation prior to
commissioning:
1.1.
Make sure that the hydraulics are connected correctly
1.2.
Check that any dirt accumulated during installation and/or
dust on the unit has been removed properly. Check
strainers and, if necessary, flush/clean them.
1.3.
Check the tightness of all seals on pipe - and device
connections and tighten them if necessary. When
tightening connections, always lock the opposite side
1.4.
Optional: Check that all electrical connections have been
made correctly, including polarity of the mains connection
and that grounding is assured.
2.
Check that the installation is filled/flushed and vented.
16
|
Combi Port Base
|
Installation and operation manual
Содержание Combi Port PRO
Страница 1: ...Combi Port Base EN Installation and operation manual CD0000306 ...
Страница 33: ...Combi Port Base Installation and operation manual 33 ...
Страница 34: ...34 Combi Port Base Installation and operation manual ...
Страница 35: ...Combi Port Base Installation and operation manual 35 ...