Scales - Models 410 and 520
— Set Up
2-12
Scale Kit Installation — 3-Point Scales
with Compression Cells
(continued)
Axle Load Cell and Riser Installation
•
BEFORE PROCEEDING, REFER “GENERAL SET UP” PAGE 2-3 FOR PROPER WARNINGS.
1. With the cart empty, use safe lifting device
with a minimum weight rating per chart to
support the weight of your grain cart. Place
the safe lifting device under the axle, near
the tire.
• Replace only 1 bar at a time. Follow Steps
2-8 before loosening hardware on any of the
other bars.
2. Remove cotter pins and axle retainer link pins,
see figure 2-8.
3. Place 4 ton supports under main frame rails,
as close to axle as possible.
4. Raise cart allowing at least 2-3” between tires
and floor.
NOTE: Carts with tracks also use spacer bars.
NOTE: A 1/16” shim (280396) may be necessary
for scale accuracy to insure cart contacts both
compression load cells simultaneously.
5. Lower axle slightly, remove two spacer
bars and discard. Install male end of
new spacer bars (283856) in axle rings.
Assemble load cell round base (bottom)
into spacer female ports, see figures 2-9
& 2-10.
Remove
cotter pins
and axle
retainer pin
Discard
Spacer
FIG. 2-8
FIG. 2-9
FIG. 2-10
SAFE LIFTING DEVICE WEIGHT
Brent Models:
780, 782
9,000 Lbs.
880, 882
12,000 Lbs.
1080, 1082
14,000 Lbs.