ÜKY/Duopel Boilers User Manual
SAFETY NOTICES
Electrical installation of this product must be done by qualified personnel in accordance
with the explanations given in this manual and applicable local or national regulations.
THIS PRODUCT MUST BE CONNECTED TO THE ELECTRICITY WITH EARTH LINE!
The boiler must be connected to a chimney in accordance with the specifications specified in the user
manual and the relevant regulations. The chimney must provide the draft value required by the
connected boiler. The boiler must not be operated without a flue connection and there must be
sufficient draft for combustion. The boiler should not be operated in the chimneys where sufficient
draft is not provided. Any malfunctioning electrical installation in the place where the boiler is
installed should be removed.
In case of changing the boiler in the boiler rooms, the old boiler should be removed or the
connection with the chimney should be ensured and the sealing place should be sealed and
insulated. Under no circumstances should more than one boiler be connected to the same chimney.
The cylindrical chimney can be passed through the chimney in the figure.
Smoke shafts should not be placed on the outer wall of the
building unless there is a technical requirement. The wall
thickness of the chimney walls should not be less than the
thickness of a brick. Hollow brick and briquette should
never be used in chimney construction. It should be
plastered inside and outside and cylindrical pipe inserted
into the rectangular chimney.
It should be ensured that fresh air always enters the area where the boiler is installed. The
dimensions mentioned in the guide should be taken as reference in this regard. The boiler must not
be installed in any place directly connected to the living areas or to such a place. To reduce the risk of
calcification and corrosion in old and new installations, the instructions given in the relevant section
of this manual should be followed by the installer installing the boiler. In particular, if the boiler is
connected to an old installation, it is necessary to completely clean the waste inside the installation
before installation. The installation should be washed several times.
Avoid excessive fuel loading into the boiler and the suitability of the feeding-waiting settings given in
the user manual should be checked. These settings, which indicate the working and stopping time of
the gearmotor, the chimney features (draft difference, etc.) to which the boiler is connected,
ambient conditions, the thermal comfort requirement of the space, the insulation of the space, etc.
varies depending on many parameters. When the settings given in the catalogue are given to operate
at a lower power than they are given for the boiler to operate at maximum power, the settings are;