UNMAK UKY/DUOPEL 100 Скачать руководство пользователя страница 1

 
 
 
 

ÜKY/Duopel Boilers              

User Manual

 

 
 

 

 
 
 
 
 
 
 
 

ÜNLÜSOY  

Yapı Malzemeleri Sanayi ve Ticaret Ltd. Şti. 

Pancar Organize Sanayi Bölgesi, 2. Etap No:2,  Torbalı – İZMİR, TURKEY 

Tel: +90 444 35 32, Fax: +90 232 469 2412 

www.unmak.com

 

Содержание UKY/DUOPEL 100

Страница 1: ...KY Duopel Boilers User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R TURKEY Tel 90 444 35 32 Fax 90 232 469 2412 www unmak com...

Страница 2: ...OTICES 6 ELECTRIC INSTALLATION INSTRUCTIONS 8 INFORMATION ABOUT COMBUSTION 10 BOILER FEAUTURES 12 RULES FOR HEATING INSTALLATION 14 CONTROL PANEL AND USER INTERFACE 17 START UP 19 FUEL FEEDING STANDBY...

Страница 3: ...ting heating installations not directly for domestic water heating However it can produce hot tap water with the help of a boiler or heat exchanger The energy required for potable water will be taken...

Страница 4: ...a sufficient capacity In order not to damage the boiler outer sheets and the boiler during transportation While carrying the rope on the forklifts on the chassis and carrying the boiler with the help...

Страница 5: ...the boiler room this is the most suitable solution The door of the boiler room should not be opened directly to the escape staircase or general use staircases and must be opened to a common hallway or...

Страница 6: ...d Laying the mounting place with tiles and tile stones makes cleaning easier It is inconvenient to keep flammable burning and easily flammable substances in the boiler room Mounting location dimension...

Страница 7: ...himney walls should not be less than the thickness of a brick Hollow brick and briquette should never be used in chimney construction It should be plastered inside and outside and cylindrical pipe ins...

Страница 8: ...ure that the proportion between the installation water flow rate and the boiler power and the 20 C difference between the boiler inlet and outlet water temperatures are not exceeded To minimize the co...

Страница 9: ...ate hot dip or c Solid copper rod should be made with electrodes Copper rod electrodes must be at least 1 5 m in diameter of 16 mm or at least 1 25 m in diameter of 20 mm and the earthing resistance o...

Страница 10: ...P a g e 9 KY Duopel Boilers User Manual Elektrik Ba lant emas...

Страница 11: ...1 4 of the chimney height The height of the chimney should be determined well and the chimney rising from the building should rise at least 80 cm from the ridge Unless compulsory the chimney sections...

Страница 12: ...1 meter above flat roofs and at least 0 4 meters above tiled roofs Excess air at high flue temperature high flue temperature also causes loss of combustion efficiency Excess air causes high flue temp...

Страница 13: ...llation from this pipe 5 Return line It is the pipe through which the water returned from the radiators or heating installation returns to the boiler It can also be called return pipe or return line 6...

Страница 14: ...510 585 Draft Pa 25 28 31 33 33 35 35 40 Temperature Control Range o C 40 90 Return Temperature Recommended o C 40 Maximum Operation Pressure bar 3 Test Pressure bar 5 Dimensions Boiler Width A mm 10...

Страница 15: ...he dispensing system to collect the expanding water volume The water expanding in the boiler is stored in the expansion tank through the flow safety pipe When the water in the installation cools the r...

Страница 16: ...P a g e 15 KY Duopel Boilers User Manual Open expansion tank installation scheme...

Страница 17: ...orrectly to minimize the addition of fresh water None of the materials used in the installation should be gas permeable Maximum 50 micron filter with synthetic or metal mesh should be placed on the fr...

Страница 18: ...nto the device It is used to increase or decrease the values of Fan Setting Temperature Setting Fuel Supply and Fuel Standby ENTER It is used for storing the set values and for entering submenus from...

Страница 19: ...is activated and deactivated with this button Manuel Fuel Feeding It is used to manually manually add fuel to the boiler As long as the button is pressed fueling continues Wood Mode It is used when i...

Страница 20: ...ic feeding Fill the hopper with wood pellet and close the cap tightly Open the control panel by pressing the ON OFF button of the device for 1 second When turned on values will appear next to Feed Set...

Страница 21: ...remain at Level 1 during the ignition Find the Fuel Feed and Fuel Standby settings in the Fuel Standby Feed Settings section of your manual which should be based on the boiler power and fuel type Pre...

Страница 22: ...en You can hold down the buttons until the temperature level you want to adjust When it reaches the desired degree you can save it by pressing the ENTER button Press the Fan Setting button of the pane...

Страница 23: ...ording to the chimney draft and the thermal comfort demand of the space In power cuts close the flue flap if any If the pump bypass line is available activate the line When the electricity comes do no...

Страница 24: ...ash collected between the blades of the fan it is necessary to clean it by blowing or holding a dryer without disturbing the blades of the fan Cleaning the boiler It should be done when the boiler is...

Страница 25: ...of plastic derivative into the boiler or fuel reservoir hopper Check that there are no holes or cracks in the chimney If you still can t consult your leg Have your chimney sealed Excessive fuel consum...

Страница 26: ...e If using automatic add fuel to the hopper manually load fuel if mechanical feeding is used Replace probe or call service Replace probe or call service If using automatic add fuel to the hopper if us...

Отзывы: