UNMAK UKY/DUOPEL 100 Скачать руководство пользователя страница 26

P a g e

 | 25

 

 

 

ÜKY/Duopel Boilers User Manual

 

PROBLEM 

CAUSE 

SOLUTION 

Burn out 

 

Air may be supplied by the 
fan at very high flow rate 
without full ignition 

 

Very high fuel supply 

 

Reduce the fan air setting. 

 

 

Reduce the feed setting from the fuel supply setting. 

Noise of noisy water 
from the boiler 

 

There may be air left in the 
boiler to fill the first water 

 

Refer to the initial start-up. 

Boiler water 
temperature was too 
high, now dropped 
but boiler not 
working 

 

Limit thermostat may be 
switch off 

 

 

Tear off the black plastic cover on the back 
of the control panel. Activate the limit 
thermostat by pressing the red pin. 

 

Turn the control panel off and on. 

 

Fuel exhausted 
warning on the panel 

 

Fuel depletion in the hopper 
 

 

Probe dislocation 

 

Probe does not feel 

 

The boiler water temperature 
drops too low after reaching 
the set temperature 

 

If using automatic, add fuel to the hopper, manually load fuel 
if mechanical feeding is used. 

 

Replace probe or call service 

 

Replace probe or call service 

 

If using automatic, add fuel to the hopper, if using mechanical 
feeding, manually add fuel. 

 
 
 

 

Increasing the fan speed more than necessary will cause some heat to be thrown out of the 
chimney. Air that comes out suddenly and in large quantities during combustion will cause 
adherence in slags. 

 

"Fuel Feed", "Fuel Standby", "Gearmotor On / Off", "Manual Fuel Feed" buttons will not work in 
"Wood Mode". 

 

While automatic feeding, you can switch to "Wood Mode", but you cannot switch from "Wood 
Mode" to automatic feeding. To switch from “Wood Mode” to automatic feeding, you can 
switch to automatic feeding after pressing the “ON / OFF” button and turning off the boiler. 

 

The boiler covers and the hopper cover should not be left open during combustion. 

 
 
 
 

 

ÜNLÜSOY YAPI MALZEMELERİ SANAYİ ve TİCARET LİMİTED ŞRKETİ 

Pancar Organize Sanayi Bölgesi, 2. Etap No:2,  Torbalı – İZMİR  

Tel: 444 35 32, Faks: 0232 469 2412 

www.unmak.com

 

Содержание UKY/DUOPEL 100

Страница 1: ...KY Duopel Boilers User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R TURKEY Tel 90 444 35 32 Fax 90 232 469 2412 www unmak com...

Страница 2: ...OTICES 6 ELECTRIC INSTALLATION INSTRUCTIONS 8 INFORMATION ABOUT COMBUSTION 10 BOILER FEAUTURES 12 RULES FOR HEATING INSTALLATION 14 CONTROL PANEL AND USER INTERFACE 17 START UP 19 FUEL FEEDING STANDBY...

Страница 3: ...ting heating installations not directly for domestic water heating However it can produce hot tap water with the help of a boiler or heat exchanger The energy required for potable water will be taken...

Страница 4: ...a sufficient capacity In order not to damage the boiler outer sheets and the boiler during transportation While carrying the rope on the forklifts on the chassis and carrying the boiler with the help...

Страница 5: ...the boiler room this is the most suitable solution The door of the boiler room should not be opened directly to the escape staircase or general use staircases and must be opened to a common hallway or...

Страница 6: ...d Laying the mounting place with tiles and tile stones makes cleaning easier It is inconvenient to keep flammable burning and easily flammable substances in the boiler room Mounting location dimension...

Страница 7: ...himney walls should not be less than the thickness of a brick Hollow brick and briquette should never be used in chimney construction It should be plastered inside and outside and cylindrical pipe ins...

Страница 8: ...ure that the proportion between the installation water flow rate and the boiler power and the 20 C difference between the boiler inlet and outlet water temperatures are not exceeded To minimize the co...

Страница 9: ...ate hot dip or c Solid copper rod should be made with electrodes Copper rod electrodes must be at least 1 5 m in diameter of 16 mm or at least 1 25 m in diameter of 20 mm and the earthing resistance o...

Страница 10: ...P a g e 9 KY Duopel Boilers User Manual Elektrik Ba lant emas...

Страница 11: ...1 4 of the chimney height The height of the chimney should be determined well and the chimney rising from the building should rise at least 80 cm from the ridge Unless compulsory the chimney sections...

Страница 12: ...1 meter above flat roofs and at least 0 4 meters above tiled roofs Excess air at high flue temperature high flue temperature also causes loss of combustion efficiency Excess air causes high flue temp...

Страница 13: ...llation from this pipe 5 Return line It is the pipe through which the water returned from the radiators or heating installation returns to the boiler It can also be called return pipe or return line 6...

Страница 14: ...510 585 Draft Pa 25 28 31 33 33 35 35 40 Temperature Control Range o C 40 90 Return Temperature Recommended o C 40 Maximum Operation Pressure bar 3 Test Pressure bar 5 Dimensions Boiler Width A mm 10...

Страница 15: ...he dispensing system to collect the expanding water volume The water expanding in the boiler is stored in the expansion tank through the flow safety pipe When the water in the installation cools the r...

Страница 16: ...P a g e 15 KY Duopel Boilers User Manual Open expansion tank installation scheme...

Страница 17: ...orrectly to minimize the addition of fresh water None of the materials used in the installation should be gas permeable Maximum 50 micron filter with synthetic or metal mesh should be placed on the fr...

Страница 18: ...nto the device It is used to increase or decrease the values of Fan Setting Temperature Setting Fuel Supply and Fuel Standby ENTER It is used for storing the set values and for entering submenus from...

Страница 19: ...is activated and deactivated with this button Manuel Fuel Feeding It is used to manually manually add fuel to the boiler As long as the button is pressed fueling continues Wood Mode It is used when i...

Страница 20: ...ic feeding Fill the hopper with wood pellet and close the cap tightly Open the control panel by pressing the ON OFF button of the device for 1 second When turned on values will appear next to Feed Set...

Страница 21: ...remain at Level 1 during the ignition Find the Fuel Feed and Fuel Standby settings in the Fuel Standby Feed Settings section of your manual which should be based on the boiler power and fuel type Pre...

Страница 22: ...en You can hold down the buttons until the temperature level you want to adjust When it reaches the desired degree you can save it by pressing the ENTER button Press the Fan Setting button of the pane...

Страница 23: ...ording to the chimney draft and the thermal comfort demand of the space In power cuts close the flue flap if any If the pump bypass line is available activate the line When the electricity comes do no...

Страница 24: ...ash collected between the blades of the fan it is necessary to clean it by blowing or holding a dryer without disturbing the blades of the fan Cleaning the boiler It should be done when the boiler is...

Страница 25: ...of plastic derivative into the boiler or fuel reservoir hopper Check that there are no holes or cracks in the chimney If you still can t consult your leg Have your chimney sealed Excessive fuel consum...

Страница 26: ...e If using automatic add fuel to the hopper manually load fuel if mechanical feeding is used Replace probe or call service Replace probe or call service If using automatic add fuel to the hopper if us...

Отзывы: