4 - Factory testing, shipping, delivery and installation
4.1 - Factory testing
The machine you have purchased has been tested at our plants to verify its correct
operation and proper adjustment. The tests were conducted using materials similar
to those processed by the user.
4.2 - Delivery and handling
All shipped material is carefully checked prior to being handed over to the shipping
agent. Unless otherwise agreed with the customer, the machine is wrapped in
nylon and strapped to the pallet. It is then covered with cardboard, which is also
strapped to the pallet. When you receive the machine, check the condition of its
packaging. If you notice any damage to the packaging, sign the delivery note with
the following wording: “Goods accepted with reservation...” and the reason.
If you notice any damage to the components of the machine after opening the
package, report it to the shipping agent within three days from the date shown on
the documents.
4.3 - Installation
WARNING!
The installation zone must be level and solid, while the surface on which the
machine rests must provide stable and safe support. Moreover, the machine must
be placed where there is ample space around it. This will ensure greater
manoeuvrability during work phases and easy access for subsequent maintenance
operations. Provide adequate lighting around the machine to ensure good visibility
for the operator using it.
- Remove the cellophane wrapping and any other packaging.
4.3.1 - Disposal of packaging
The packaging materials (cardboard, nylon, wood, etc.) can be regarded as solid
urban waste. As a result, they can be disposed of freely. Nylon is a polluting
substance that releases toxic fumes when burnt. Do not burn or dump it, but
dispose of it according to the law. If the machine is delivered to a country where
special regulations apply, dispose of the packaging accordingly.
4.3.2 - Handling the machine
WARNING!
Take care when handling the machine: dropping it accidentally can seriously
damage it. To avoid muscle injuries, lift the machine by flexing your legs.
4.4 - Electrical connections
WARNING!
Check that the power supply line has the same specifications as those shown on
the rating plate of the machine. All interventions must be carried out solely by
specialised personnel expressly authorised by the relevant supervisor. Make the
Содержание UPASTA
Страница 1: ...1 Operating and Maintenance Manual Ed 001 12 2020 Pasta machine UPASTA ...
Страница 2: ...2 ...
Страница 12: ...12 2 4 Wiring diagrams 2 4 1 Single phase wiring diagram ...
Страница 23: ...23 ...
Страница 24: ...24 AUTHORISED DEALER Univex Corp 3 Old Rockingham Road Salem NH 03079 USA info univexcorp com ...