7
Fig. 13
Fig. 14
ALL WORKS ON THE ELECTRICAL
SYSTEM, INCLUDING MINOR
OPERATIONS,
MUST BE CARRIED OUT BY
PROFESSIONALLY
QUALIFIED PERSONNEL
- Check that the cable mains supply is the same as
that shown on the registration plate.
- Connect the cable to a plug that conforms with
European norms or to the norms of the country in
which the machine is used.
- The plug must have an earth terminal. ( Fig. 13 )
- Check that the earth connection is efective.
- The machine must be connected to the mains
through a multipole isolating switch which
conforms with European norms and with contact
openings of at least 3 mm.
- Check that the multipole connector on the
electrical board is correctly connected.
- When the machine is connected, switch it on and
check the correct direction of rotation. This should
be as shown by the arrow on the motor unit.
( Fig. 14 )
- If the rotation is reversed, reverse the two wires in
the connection plug.
- If the machine behaves abnormally, immediately
switch off the main switch ( Fig. 15 ) and check the
section “Malfunctions causes and possible
remedies“ in the instructions manual.
BEFORE STARTING WORK, LET THE
ENGINE IDLE FOR 10 MINUTES IN THE
AUTUMN AND WINTER MONTHS.
START WORK LATER.
AT THE OIL SYSTEM USE SHELL
TELLUS 46 ONLY OR OTHER
HYDRAULIC OIL VISCOSITY 46.
THE MANUFACTURER DOES NOT
ACCEPT ANY RESPONSIBILITY FOR
THE FAILURE TO OBSERVE THE
ABOVE MENTIONED INSTRUCTIONS.
Содержание AT-26
Страница 1: ...INSTRUCTIONS BOOKLET Automatic Truck Tyre Changer Machine AT 14 26 ...
Страница 14: ...14 DEMONTAGE PLAN ...
Страница 15: ...15 ...
Страница 16: ...16 ...