background image

9

•DRAWINGS FOR ILLUSTRATION PURPOSES ONLY•

RULES FOR CONNECTOR PIPE INSTALLATION

  FIG. 6

The crimped end of the chimney connector
fits inside the furnace flue collar. Install
additional chimney connector and elbow
with the CRIMPED END TOWARD THE
FURNACE. This will allow any condensa-
tion in the flue to run back into the furnace.
Use 6" dia. (minimum 24 gauge)  black
chimney connector.
Slope any horizontal pipe upward toward the
chimney at least 1/4 inch for each foot of
horizontal run.
You must have at least 18 inches of
clearance between any horizontal piping
and the ceiling. (See Fig. 3)
The chimney connector must not extend
into the chimney flue (See Fig. 6).
Seal each chimney connector pipe joint with
furnace cement. Also seal the pipe at the
chimney.
Use 3 sheet metal screws at each chimney
pipe joint to make the piping rigid.
The chimney connector may include a sec-
tion for a barometric draft regulator between
the furnace and the chimney (Fig. 4, 5, 6, &
7). The barometric draft regulator must be
installed in the same room (same pressure
zone) as the furnace.
Install the barometric draft regulator strictly
in accordance with the instructions that are
provided with the barometric draft regulator.
A solid damper can be placed between the
barometric draft regulator and the chimney.
(Fig. 4, 5, 6, & 7)

1.

2.

3.

4.

5.

6.

7.

8.

9.

FIG. 7

Adjusting the
Barometric Draft Regulator

Drill a hole in the chimney connector within
18" of the flue collar below the barometric
draft regulator just large enough for the
tube of the manometer.
Build a fire after all chimney connections
have been made.
Use a manometer to measure the draft in
the flue. (U.S. Stove Model DG-26)
Adjust the barometric draft regulator to
obtain a draft of 0.05" - 0.06" W.C. under
stable conditions.

1.

2.

3.

4.

Содержание HOTBLAST 1200G

Страница 1: ...E U S ONLY FOR INSTALLATION AS A CENTRAL FURNACE DO NOT USE THIS FURNACE IN A MOBILE HOME OR TRAILER Improper Installation May Void Your Warranty Save This Manual For Future Reference CAUTION Read All...

Страница 2: ...ing Masonry Chimney SEE Page 8 Electrical Wiring 6 Draft Regulator 1 2 Conduit Conduit Connectors Furnace Cement Manufacturer Recommends Rutland Black Code 78 or Equivalent Plenum and Duct Work as Req...

Страница 3: ...operly installed a house fire may result For your safety follow the in stallation directions Contact local building or fire officials about restrictions and installation in spection requirements in yo...

Страница 4: ...st have free access to the room CAST IRON PARTS MUST BE SEASONED TO AVOID CRACKING BUILD ONLY SMALL FIRES ON FIRST USE To prevent injury do not allow anyone to use this furnace who is unfamiliar with...

Страница 5: ...as or oil fired forced air upflow type central furnace or it may be installed as a central furnace CARING FOR PAINTED PARTS This furnace has a painted outside jacket which is durable but it will not s...

Страница 6: ...6 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY MODEL 1200G DIMENSIONS FIG 1...

Страница 7: ...305 mm Unit to backwall 30 760 mm Chimney connector pipe to sidewall 21 530 mm Chimney connector pipe to backwall 18 460 mm Hot air ducts to combustibles 6 150 mm NOTE Install only on a noncombustible...

Страница 8: ...e flue liner to be sure it is safe to use Make repairs before attaching the furnace See Page 4 item 5 Look at Fig 4 The connector pipe and fittings you will need to connect directly to a masonry chimn...

Страница 9: ...al screws at each chimney pipe joint to make the piping rigid Thechimneyconnectormayincludeasec tionforabarometricdraftregulatorbetween the furnace and the chimney Fig 4 5 6 7 The barometric draft reg...

Страница 10: ...ndle Feed Door Latch Ash Door Handle Ash Door Latch Blower and Blower Control Electrical Connections Remove all parts from inside the furnace and inspect for damage including the firebrick as some bre...

Страница 11: ...in the parts bag 3 Unbox the blower and attach to the unit by sliding the flange on the blower between the cabinet back and the unit bottom 4 Now attach the blower to the unit by lining up the two ho...

Страница 12: ...OR ILLUSTRATION PURPOSES ONLY MODEL 1200Q WIRING DIAGRAM FIG 11 LIMIT CONTROL BLACK WHITE WHITE BLACK WHITE BLACK GREEN 2 x 4 JUNCTION BOX BLOWER TO HOUSE SUPPLY NOTE GROUND HOUSE SUPPLY TO INSIDE OF...

Страница 13: ...ed on the label and earlier in this manual are maintained Seal the smoke pipe in the chimney with furnace cement The chimney connector shall be se curely supported and joints fastened with sheet metal...

Страница 14: ...TIONS Operation after loss of power Remove filter if provided Do not expect to keep home at normal temperatures Do not load fuel above bottom of feed door Set Fuel door and Ash door spin draft maximum...

Страница 15: ...15 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY CENTRAL INSTALLATION U S CANADA ADD ON INSTALLATION U S ONLY...

Страница 16: ...AGRAM FIG 14 TO GAS OIL ELECTRIC TRANSFORMER HOTBLAST COMBINATION CONTROL LIMIT FAN JUMPER IN H H POWER SUPPLY GAS OIL ELECTRIC POWER SUPPLY JUNCTION BOX CENTRAL FURNACE BLOWER MOTOR WOOD FURNACE BLOW...

Страница 17: ...AMAGE THE FURNACE OPERATING INSTRUCTIONS The temperature in the plenum of the warm air furnace at which the blower turns on or turns off is controlled by the setting of the pointers in the blower limi...

Страница 18: ...the chimney should be at least 3 feet above the roof and be at least 2 feet higher than any point of the roof within 10 feet Fig 5 See page 28 for list of trouble shooting tips 4 5 6 A DRAFT READING O...

Страница 19: ...19 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY MODEL 1200G PARTS...

Страница 20: ...DOOR GASKET 4 58FT 88066 16 1 2 13 LOCK NUT 2 83444 17 1 2 SAE FLAT WASHER 2 83835 18 3 8 16 LOCK NUT 3 83274 19 ASH DOOR HINGE 1 24960 20 DOOR LATCH 2 24958 21 FEED DOOR PAINTED 1 24962 22 DRAFT CAP...

Страница 21: ...21 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY APPENDIX INSTALLATION A NOTE ANTI BACKDRAFT FLAPPERS OR BAFFLE ARE REQUIRED FOR THIS INSTALLATION...

Страница 22: ...22 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY APPENDIX INSTALLATION B NOTE ANTI BACKDRAFT FLAPPERS OR BAFFLE ARE REQUIRED FOR THIS INSTALLATION...

Страница 23: ...23 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY APPENDIX INSTALLATION C NOTE ANTI BACKDRAFT FLAPPERS OR BAFFLE ARE REQUIRED FOR THIS INSTALLATION...

Страница 24: ...24 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY APPENDIX INSTALLATION D U S ONLY INSTALLATION E U S ONLY...

Страница 25: ...25 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY APPENDIX INSTALLATION F INSTALLATION G...

Страница 26: ...26 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY NOTES...

Страница 27: ...rning green wood not seasoned or dry b Thermostat setting too low for type fuel a Insufficient draft b Smothering fire when adding fresh fuel a Set thermostat higher b Clean chimney c Add raincap to c...

Страница 28: ...EN WRITING ALWAYS GIVE THE FULL MODEL NUMBER WHICH IS ON THE NAMEPLATE ATTACHED TO THE HEATER WHEN ORDERING REPAIR PARTS ALWAYS GIVE THE FOLLOWING INFORMATION AS SHOWN IN THIS LIST 1 THE PART NUMBER 2...

Отзывы: