
4
OMB Control No. 2060-0161
Approval expires 03/31/2019
OMB Control No. 2060-0693
Approval expires 03/31/2019
30-DAY NOTIFICATION
2015 CLEAN AIR ACT (CAA) STANDARDS OF PERFORMANCE FOR NEW
RESIDENTIAL WOOD HEATERS, NEW RESIDENTIAL HYDRONIC HEATERS
AND FORCED-AIR FURNACES 40 CFR PART 60 SUBPARTS AAA AND QQQQ
The public reporting and recordkeeping burden for this collection of information is estimated to average 2 hours
per response. Send comments on the Agency's need for this information, the accuracy of the provided burden
estimates, and any suggested methods for minimizing respondent burden, including through the use of
automated collection techniques to the Director, Regulatory Support Division, U.S. Environmental Protection
Agency (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any
correspondence. Do not send the completed form to this address.
Disclaimer: The statutory provisions and the EPA regulations described in this document contain legally binding
requirements. This document is not a substitute for those provisions or regulations, nor is it a regulation itself.
In the event of a discrepancy, please refer to 40 CFR PART 60 Subparts AAA AND QQQQ, sections 60.537 and
60.5479. If you have additional questions, please contact Rafael Sanchez at 202-564-7028 or via email at
Instructions: The manufacturer of an affected wood/pellet heater/central heater model line must notify the
Administrator of the date that certification testing is scheduled to begin by email to
. This notice must be received by the EPA at least 30 days before the start of
testing.
John D. Voorhees, VP of Compliance
___________________________________________
Print Name and Title of Authorized Official
____________________________________________
Signature
January 10, 2022
Date
Telephone Number: _
423 837-2100 Ext 4513
___________________________
Email Address: [email protected]
Remarks:
v1
2/7/2022 Revised 30 day to conform to new requirements per ALT-146 - Attached
2/10/2022 -Revised 30 day due to shipping delay. Unit is delayed in transit.
Содержание KP5522
Страница 11: ...Project 22 753 Model KP5522 Page 10 Appliance Front Appliance Left...
Страница 12: ...Project 22 753 Model KP5522 Page 11 Appliance Right Appliance Rear...
Страница 14: ...Project 22 753 Model KP5522 Page 13 Pellet Fuel Analysis...
Страница 17: ...Project 22 753 Model KP5522 Page 16 Sealed Unit...
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 58: ...Project 22 751 Model Charnwood Skye E700 Page 16 Tunnel Schematic...
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 129: ...2022 United States Stove Company 25 NOTES...
Страница 177: ...2022 United States Stove Company 25 NOTES...
Страница 272: ...24 2022 United States Stove Company NOTES...
Страница 308: ......
Страница 309: ......
Страница 311: ......
Страница 312: ......
Страница 318: ......
Страница 319: ......