background image

15

INSTALLING YOUR ROOM HEATER - continued

FREESTANDING EXTERIOR VERTICAL INSTALLATION

1.  Locate your Pellet Stove Room Heater in a location which meets the requirements of this manual, but in an area where 

it does not interfere with the house framing, wiring, etc.

2.  Install a non-combustible hearth pad underneath the pellet stove. This pad should extend at least 6” (152mm) in front 

of the unit.

3. 

Place your Pellet Stove Room Heater on the hearth pad and locate the unit in manner that will leave the exhaust vent 

with a minimum of 3” (75mm) clearance to any combustible wall.

4. 

If installing the optional air intake, locate the center of the combustion air intake pipe at the back of your unit. Line up 

the center with the same spot on your exterior wall and cut a 2-1/2” (64mm) diameter hole through the wall.

5. 

Secure all vent joint connections with 3 screws. Seal the exhaust vent joint connections with high temperature silicone 
sealant. 

6. 

Locate the center of the exhaust pipe, at the back of the unit. Line up the center with the same spot on the exterior wall 

a cut a 7” (178mm) diameter hole through the wall.

7.  Install the wall thimble; (refer to the instructions which come with the wall thimble).

8.  Install an approved exhaust vent through the wall; be sure to make sure that 3” (75mm) clearances to combustibles are 

maintained.

9.  Secure all vent joint connections with 3 screws. Seal the exhaust vent joint connections with high temperature silicone 

sealant.

10.  Install a Tee with a cleanout on the end of the exhaust pipe and then install approved venting upward from there. Be 

sure to install support brackets every 5’ (1525cm) to keep the venting straight and secure.

11.  Extend the exhaust vent through the roof flashing and ensure that the vertical cap is approximately 36” (900mm) above 

the roof.

Figure 11

Listed Termination

Flashing

36” (900 mm)

3” (75 mm)

Clearance

6” (150 mm)

Clearance

Wall Thimble

Tee

w/ Cleanout

Support Bracket

6” (150mm)

Non-Combustible

Floor Protection

Existing Combustible 

Floor

Combustion Air

Intake

Содержание 5560

Страница 1: ...ay result For everyone s safety FOLLOW all Installation and Operating Directions Never use makeshift compromises during the installation of this appliance Contact your local building or fire officials...

Страница 2: ...Instructions 8 9 Thermostat Installation 10 Clearances to Combustibles 11 Installing Your Room Heater 12 19 Mobile Home Installations 20 Insert Pellet Stove Installation 21 24 Vent Termination Locatio...

Страница 3: ...r by 1 1 2 length Ash Content 1 Maximum Premium grade 3 Maximum Standard grade Moisture Content 8 Maximum Heat Content Minimum 8 200 btu s per hour It is important to note that the ash content of the...

Страница 4: ...is maintained Make sure that structural integrity of the home is maintained when passing vent pipes through walls ceilings and roofs It is recommended that the exhaust vent be cleaned bi annually or a...

Страница 5: ...ower outages with battery backup or room air starvation occurs during operation of heater smoke in the house may result This may trigger smoke detectors if they are installed CAUTION DO NOT CONNECT TO...

Страница 6: ...s per hour or 5 1 lbs of fuel per hour Hopper Capacity 55 lbs Dependent upon quality and heating value of pellet fuel DIMENSIONS Figure 1 6 00 in 152 4 mm 13 70 in 348 mm 20 50 in 520 8 mm 10 50 in 26...

Страница 7: ...IMENSIONS continued The minimum installation dimensions of the insert opening are 32 813mm wide x 22 3 4 578mm high x 12 1 4 311mm deep Figure 2 7 10 3 4 11 1 2 13 11 16 39 7 8 29 7 8 23 1 8 3 7 16 20...

Страница 8: ...uel in the auger press and release the On Off button The LED indicator light above the On Off button will alternately flash green then red to indicate that the start up cycle has begun The light above...

Страница 9: ...then Automatically Initiate the Normal Ignition Cycle NOTICE Do not use this procedure for normal startup To do so would cause excessive fuel build up in the burn pot AUGER TRIM Button This Button is...

Страница 10: ...terminal on the rear of the control panel see Figure 4 If you have installed a remote thermostat for your pellet stove and wish to have the heater controlled by that thermostat depress the MODE butto...

Страница 11: ...d be installed under the heater The non combustible hearth pad must extend at least 6 beyond the fuel loading and ash removal openings and at least the depth of the heater plus 6 inches 152mm out in f...

Страница 12: ...s not interfere with the house framing wiring etc 2 Install a non combustible hearth pad underneath the pellet stove This pad should extend at least 6 152mm in front of the unit 3 Place the pellet sto...

Страница 13: ...by Pellet Vent Mfg Combustion Air Intake 6 152mm Clearance to Combustibles Floor Protector 6 152mm Clearance Front Figure 9 6 152 mm Clearance Wall to Back of Unit Wall Thimble Exhaust Vent 45 Elbow...

Страница 14: ...rough the wall 5 Secure all vent joint connections with 3 screws Seal the exhaust vent joint connections with high temperature silicone sealant 6 Install the combustion air intake pipe 7 Install a tee...

Страница 15: ...temperature silicone sealant 6 Locate the center of the exhaust pipe at the back of the unit Line up the center with the same spot on the exterior wall a cut a 7 178mm diameter hole through the wall 7...

Страница 16: ...16 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk...

Страница 17: ...17 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS UP AND OUT HORIZONTAL TERMINATION KIT FIGURE 12 Images courtesy of Selkirk...

Страница 18: ...18 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS STRAIGHT OUT HORIZONTAL TERMINATION KIT FIGURE 12 Images courtesy of Selkirk...

Отзывы: