![United Process Controls Oxyfire-LT Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/united-process-controls/oxyfire-lt/oxyfire-lt_installation-and-operation-manual_4007065018.webp)
United Process Controls, Inc.
Oxyfire-LT Installation/Operation Manual
18 |
P a g e
4. Rotate the assembly aligning the two SHCS in
the clearance holes.
5. Remove the assembly from the body.
Clean out any debris before replacing the
Electrolyte Assembly, inspect heater assembly
to insure proper connection. If necessary, you
may have to use 0.005" shims under the
busing in order to align the zirconia tube.
Do not attempt to replace the electrolyte
assembly unless you have been properly
trained by UPC personnel.