FPLC V2 Slim: Installation manual

Installation Manual - FPLC V2 SLIM

FPLC V2 Slim must be firmly installed on the ceiling with 
the use of metal screws and the appropriate for the ceiling 
anchors. The ceiling surface on which the FPLC V4 will be 
installed, must be able to bare 3 times the total weight of 
the application: lift weight of the flat panel 
+weight of the ceiling cover.

Lift weight: 
FPLC V2 30-40 = 60kg
FPLC V2 42-50 = 72kg
FPLC V2 52-60 = 84kg
The FPLC V2 slim lift must be mounted through the 4 slat 
holes shown in the drawing beside, with the use of (4) four 
M10 screws with washer.

The hole pattern is:
FPLC V2 30-40 : 990x695mm
FPLC V2 42-50 : 1247x831mm
FPLC V2 52-60 : 1447x961mm

Important Note: 

Important Note: 

The distance between the back side of the lift and the back 
side of the false ceiling box (if applicable) must be at least 
20mm in order to have enough room for the ceiling cover 
to rotate inside the false ceiling (see drawing beside).

Ceiling hole recommended dimensions:

 

FPLC V2 30-40 : 1495x820mm

 

FPLC V2 42-50 : 1752x956mm

 

FPLC V2 52-60 : 1952x1086mm

The flat panel must be mounted, aligned and centred, on 
the two vertical bars shown in the drawing beside, after 
they are adjusted in the appropriate distance, in order to 
feet the vesa mounting of the screen. 

Thank you for purchasing a FPLC V2 SLIM lift! 

Please make sure to read the instructions mentioned below before installing and using this lift!

FPLC V2 Slim mechanism is manufactured for flat panel installation on ceiling in horizontal position and should be installed by 

specialized 

installers.

The lift must be firmly, well balanced  and tightly mounted on the ceiling, so that there will be no oscillation during opening and closing 
of the lift. In cases when the ceiling has big depth, then special over constructions of metal or other firm structure must be applied 
before the lift is installed, in order to achieve lift's firm mounting.

page 1/3