![Unitary products group HDHB180 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/unitary-products-group/hdhb180/hdhb180_installation-instruction_4033801006.webp)
6
Unitary Products Group
035-17393-000 Rev. A (0501)
FIG. 4 - UNIT DIMENSIONS AND CLEARANCES
Overhead (Top)
1
120"
Front
(Piping and Access Panels)
30"
Left Side
24"
Right Side
24"
Rear
24"
Bottom
2
0"
1
Units must be installed outdoors. Overhanging structures
or
shrubs should not obstruct condenser air discharge.
2
Adequate snow clearance must be provided if winter
operation is expected.
is expected.
CLEARANCES
All dimensions are in inches. They are sub-
ject to change without notice. Certified di-
mensions will be provided upon request.
Connection
Entry
Connection Size
15 Ton
20 Ton
Suction Line
A
1-5/8 ID
2-1/8 ID
Liquid Line
B
5/8 OD
5/8 OD
Power Wiring
C
2-1/8 KO
2-1/8KO
Control Wiring
D
7/8 KO
7/8 KO
Accessory Wiring E
7/8 KO
7/8 KO
Accessory Wiring F
1-3/8 KO
1-3/8 KO
OTE: Suction line connection is a belled
fitting.
,
*
+
)
FIG. 5 - POINT LOADS
UNIT
4 - POINT LOAD (LBS)
TOTAL
A
B
C
D
180
240
930
990
325
346
218
232
155
165
232
247