background image

271043-UIM-B-0707

8

Unitary Products Group

SECTION V: ELECTRICAL POWER

ELECTRICAL POWER CONNECTIONS

Field wiring to the unit must be grounded. Electric wires that are field
installed shall conform to the temperature limitation for 63°F (35°C) rise
wire when installed in accordance with instructions. Refer to Table 7 in
these instructions for specific furnace electrical data.

TABLE 5: 

Nominal Manifold Pressure - High Fire

Second Stage Manifold Pressures (in wc)

Second Stage Manifold Pressures (kpa)

Altitude (feet)

Altitude (m)

0-7999

8000-8999

9000-9999

0-2437

2438-2742

2743-3048

Ga

s Hea

tin

g V

a

lue

(B

TU

/c

u f

t.)

800

3.5

3.5

3.5

Ga

s Hea

tin

g V

a

lue

(M

J/

cu

 m)

29.8

0.87

0.87

0.87

850

3.5

3.5

3.5

31.7

0.87

0.87

0.87

900

3.5

3.5

3.5

33.5

0.87

0.87

0.87

950

3.5

3.5

3.3

35.4

0.87

0.87

0.81

1000

3.5

3.2

2.9

37.3

0.87

0.80

0.73

1050

3.5

2.9

2.7

39.1

0.87

0.73

0.67

1100

3.2

2.7

2.4

41.0

0.80

0.66

0.61

2500 (LP)

9.8

8.2

7.5

93.2 (LP)

2.44

2.03

1.86

TABLE 6: 

Nominal Manifold Pressure - Low Fire

First Stage Manifold Pressures (in wc)

First Stage Manifold Pressures (kpa)

Altitude (feet)

Altitude (m)

0-7999

8000-8999

9000-9999

0-2437

2438-2742

2743-3048

Gas

 He

at

ing

 V

a

lu

e

(B

TU/cu

 f

t.)

800

1.7

1.7

1.7

Gas

 He

at

ing

 V

a

lu

e

(M

J/

cu

 m)

29.8

0.42

0.42

0.42

850

1.7

1.7

1.7

31.7

0.42

0.42

0.42

900

1.7

1.7

1.7

33.5

0.42

0.42

0.42

950

1.7

1.7

1.5

35.4

0.42

0.42

0.38

1000

1.6

1.5

1.4

37.3

0.41

0.37

0.34

1050

1.5

1.4

1.3

39.1

0.37

0.34

0.31

1100

1.3

1.2

1.1

41.0

0.34

0.31

0.28

2500 (LP)

4.1

3.8

3.5

93.2 (LP)

1.03

0.95

0.87

PROPANE AND HIGH ALTITUDE CONVERSION KITS
It is very important to choose the correct kit and/or gas orifices for the altitude and the type of gas for which the furnace is being installed.
Only use natural gas in furnaces designed for natural gas. Only use propane (LP) gas for furnaces that have been properly converted to use pro-
pane (LP) gas. Do not use this furnace with butane gas.
Incorrect gas orifices or a furnace that has been improperly converted will create an extremely dangerous condition resulting in premature heat
exchanger failure, excessive sooting, high levels of carbon monoxide, personal injury, property damage, a fire hazard and/or death.
High altitude and propane (LP) conversions are required in order for the appliance to satisfactory meet the application.
An authorized distributor or dealer must make all gas conversions.
In Canada, a certified conversion station or other qualified agency, using factory specified and/or approved parts, must perform the conversion.
The installer must take every precaution to insure that the furnace has been converted to the proper gas orifice size when the furnace is installed.
Do not attempt to drill out any orifices to obtain the proper orifice size. Drilling out a gas orifice will cause misalignment of the burner flames,
causing premature heat exchanger burnout, high levels of carbon monoxide, excessive sooting, a fire hazard, personal injury, property damage
and/or death.

Use copper conductors only.

Содержание AHC9V UP

Страница 1: ...electrical and mechanical codes LIST OF SECTIONS SAFETY 1 DUCTWORK 4 FILTERS 6 GAS PIPING 7 ELECTRICAL POWER 8 COMBUSTION AIR AND VENT SYSTEM 12 CONDENSATE PIPING 18 SAFETY CONTROLS 19 START UP AND AD...

Страница 2: ...ible materials as listed under Clearances to Combustibles in Table 1 Provide clearances for servicing ensuring that service access is allowed for both the burners and blower These models ARE NOT CSA l...

Страница 3: ...or and the furnace must be located or protected to avoid physical damage by vehicles The furnace area must not be used as a broom closet or for any other storage purposes as a fire hazard may be creat...

Страница 4: ...NOTE When attaching duct flange do not shoot the screw down into the casing Use the formed flange intended for duct flange attachment The duct system is a very important part of the installation If th...

Страница 5: ...e presence of leaks in the heat exchanger This access cover shall be attached in such a manner as to prevent leaks TABLE 2 Minimum Duct Sizing For Proper Airflow Input Cabinet Airflow Return1 Rectangu...

Страница 6: ...provided with that accessory for proper hole cut size SECTION III FILTERS FILTER INSTALLATION All applications require the use of a filter Filters must be installed external to the furnace cabinet DO...

Страница 7: ...igure 1 dimensions The inlet to the gas valve lines up directly with the opening in the left side of the furnace casing To line up with the opening in the right side of the casing two street ells shou...

Страница 8: ...5 1 4 1 3 39 1 0 37 0 34 0 31 1100 1 3 1 2 1 1 41 0 0 34 0 31 0 28 2500 LP 4 1 3 8 3 5 93 2 LP 1 03 0 95 0 87 PROPANE AND HIGH ALTITUDE CONVERSION KITS It is very important to choose the correct kit...

Страница 9: ...o the terminal board on the ignition module as shown in Figures 5 and 6 Electronic thermostats may require the common wire to be connected as shown in Figures 5 and 6 Apply strain relief to thermostat...

Страница 10: ...ight O Reversing Valve Energized in Cool TWO STAGE AIR CONDITIONING Comfort Alert Interface HUM Dehumidification Open on Humidity Rise C 24 Volt Common C 24 Volt Common R 24 Volt Hot W2 Second Stage H...

Страница 11: ...W2 Delay on furnace to OFF HM Humidistat BSG Bonnet Sensor Bonnet Sensor Optional BS Bonnet Sensor AUX Auxiliary Heat E W1 First Stage Auxiliary Heat E W1 First Stage Auxiliary Heat W Auxiliary Heat Y...

Страница 12: ...length listed in Table 8 is for the vent pip ing and the air intake piping separately For example if the table allows 65 equivalent feet for a particular model then the vent can have 65 equivalent fe...

Страница 13: ...piping apply cement primer and the cement per the manufactures instructions Primer and cement must conform to ASTM D2564 for PVC or ASTM D2235 for ABS piping 7 All joints must provide a permanent air...

Страница 14: ...ns 9 inches 23 cm for models 50 000 BTUH 15 kW 12 inches 30 cm for models 50 000 BTUH 15 kW C Clearance to permanently closed window 12 inches 30 cm 12 inches 30 cm D Vertical clearance to ventilated...

Страница 15: ...systems must be installed so the vent and the combustion air pipes terminate in the same atmospheric zone Refer to Figures 11 or 12 VENTING MULTIPLE UNITS Multiple units can be installed in a space or...

Страница 16: ...vent Care should be taken to locate side vented systems where trees or shrubs will not block or restrict supply air from entering the terminal Also the terminal assembly should be located as far as p...

Страница 17: ...LE VENT GAS VENT SOFFIT VENT VENTILATED ATTIC TOP ABOVE INSULATION OPTIONAL INLET a OUTLET AIR a VENTILATED CRAWL SPACE GAS WATER HEATER VENTILATED ATTIC TOP ABOVE INSULATION GAS VENT GABLE VENT SOFFI...

Страница 18: ...Air The ventilated attic space or a crawl space from which the combustion air is taken must comply with the requirements specified in AIR SOURCE FROM OUTDOORS in this instruction or in Section 5 3 Air...

Страница 19: ...e controls are mounted on the burner box assembly If the temper ature in the burner box exceeds its set point the ignition control and the gas valve are de energized The operation of this control indi...

Страница 20: ...ll start and come up to speed Shortly after inducer start up the hot surface igniter will glow for about 17 seconds b After this warm up the ignition module will energize open the main gas valve c Aft...

Страница 21: ...3600 then divided by the time it took to measure 0 10 m3 of gas from the gas meter For Propane LP Gas multiply the Heat content of the gas MJ m3 or Default 93 15 times 0 10 m3 of gas measured at the...

Страница 22: ...shown in Figure 21 The procedure below is used to adjust either the high fire manifold pressure or the low fire manifold pressure IMPORTANT The cap for the pressure regulator must be removed entirely...

Страница 23: ...blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as shown in Figure 23 WITH BURNER BOX COVER IN PLACE WITH BURNER BOX COVER REMOVED FIG...

Страница 24: ...een the R and W terminals The indoor fan motor is energized through the W1 heat terminal and runs on the speed selected on the HEAT tap of the control board Humidistat When a humidistat is installed i...

Страница 25: ...T CODE STORAGE AND RETRIEVAL The control in this furnace is equipped with memory that will store up to five error codes to allow a service technician to diagnose problems more easily This memory will...

Страница 26: ...A C 52 1 35 4 53 2 35 4 1560 1010 1620 1030 C B 44 2 28 6 45 9 29 2 1470 940 1500 960 B C 41 6 26 6 42 5 27 2 1370 890 1410 880 D B 38 8 25 2 39 9 24 9 1460 930 1490 920 C A 41 3 26 3 42 2 26 1 1250 7...

Страница 27: ...in in2 cm2 In W C kPA In W C kPA In W C kPA 0 750 0 21 4 230 1484 0 01 0 00249 0 01 0 00249 0 15 0 03736 751 1000 21 25 28 32 330 2129 0 05 0 01245 0 05 0 01245 0 20 0 04982 1001 1250 28 33 35 40 330...

Страница 28: ...Printed in U S A 271043 UIM B 0707 Copyright by York International Corp 2007 All rights reserved Supersedes 271043 UIM A 0407 Unitary 5005 Norman Products York OK Group Drive 73069 SECTION X WIRING D...

Отзывы: