Emoji Roller GMP Manual
09/17/2022
37
Step 1 Power off the machine. Open the Back upper&bottom door.
Step 2 Locate Ball tube. Turn the Ball tube cover counterclockwise to take Ball tube out.
Step 3 Turn the Swing screws counterclockwise to take Ball-up mechanism out. Unplug the
connector
Back upper door
Back bottom door
Ball tube
Ball-up
mechanism
Swing screws
Содержание emoji ROLLER
Страница 20: ...Emoji Roller GMP Manual 09 17 2022 19 10 Collect 6 different Emoji balls to win BONUS prize 6 Emoji balls...
Страница 54: ...Emoji Roller GMP Manual 09 17 2022 53 10 2 Panel Assembly...
Страница 71: ...Emoji Roller GMP Manual 09 17 2022 70 10 17 Decal Part 19 20...
Страница 73: ...Emoji Roller GMP Manual 09 17 2022 72...
Страница 79: ...Emoji Roller GMP Manual 09 17 2022 78 10 18 Electrical Component 1 2 3 4 5 6 7 8 9 10 11 12 13...