Emoji Roller GMP Manual
09/17/2022
35
9. MAINTENANCE & INSPECTION
9.1 Safety Check
Check the points listed before operating the machine. These checks are necessary for safe
machine operation:
1. Test game before operation each day.
2. Conduct monthly routine checks of game components to ensure good working
condition.
3. Check the machine regularly for dust and clean when necessary.
Note: Parts and components require preventative maintenance to maintain proper
operation.
9.2 Handling Precautions
When installing or inspecting the machine, be very careful and pay attention to ensure that
the player can enjoy the game safely.
I
nappropriate handling running counter to the cautionary matters can cause personal injury
or damage to the machine.
9.3 Ball Tube Replacement Instruction
Step 1 Power off the machine. Open the Back upper&bottom door.
We do not recommend using power tools as they may cause damage.
NOTICE
Back upper door
Back bottom door
Содержание emoji ROLLER
Страница 20: ...Emoji Roller GMP Manual 09 17 2022 19 10 Collect 6 different Emoji balls to win BONUS prize 6 Emoji balls...
Страница 54: ...Emoji Roller GMP Manual 09 17 2022 53 10 2 Panel Assembly...
Страница 71: ...Emoji Roller GMP Manual 09 17 2022 70 10 17 Decal Part 19 20...
Страница 73: ...Emoji Roller GMP Manual 09 17 2022 72...
Страница 79: ...Emoji Roller GMP Manual 09 17 2022 78 10 18 Electrical Component 1 2 3 4 5 6 7 8 9 10 11 12 13...