![UNIRAC ULA Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/unirac/ula/ula_installation-manual_3928572010.webp)
ULA
PLANNING AND
ASSEMBLY
INSTALLATION MANUAL
INSTALLATION GUIDE
PAGE
8
INSTALL MICROINVERTER MOUNT T-BOLT:
Apply Anti-Seize and install pre-assembled ¼” dia. bonding T-bolts into
top ¼” rail slot at microinverter locations. Rotate bolts into position.
INSTALL MICROINVERTER:
Install microinverter on to rail. Engage with bolt.
INSTALL MICROINVERTER:
Torque 1/4” nut to 10 ft-lbs with Anti-Seize.
ALIGN POSITION INDICATOR:
Verify that position indicator on bolt is perpendicular
to rail.
MICROINVERTER MOUNTING
NOTE: MLPE Mount is certified for single use only.