APPENDIX A

The ULA system has been certified and listed to the UL 2703 standard (Rack Mounting Systems and Clamping Devices for Flat-Plate Photovoltaic Modules 

and Panels). This standard included electrical grounding, electrical bonding and mechanical load testing.

In conducting these tests, specific modules are selected for their physical properties so that the certifications can be broadly applied. The following lists the 

specific modules that were tested and the applicability of those certifications to other modules that might come onto the market.

In addition to UL 2703 certification, Unirac performs internal testing beyond the requirements of certification tests in order to establish system functional 

limits, allowable loads, and factors of safety. These tests include functional system tests, and destructive load testing.

Note: 

• 

Please refer U-Builder engineering report or stamped engineering package for information on mechanical load ratings, spans and cantilevers.

• 

Load ratings mentioned above are applicable for modules on table not on substructure.

Mechanical Load Test Modules

The modules selected for UL 2703 mechanical load testing were 

selected to represent the broadest range possible for modules on 

the market. The tests performed cover the following basic module 

parameters:

• Frame thicknesses greater than or equal to 1.0 mm
• Basic single and double wall frame profiles (some complex frame  

 

   profiles could require further analysis to determine applicability)
• Clear and dark anodized aluminum frames

• 

PV modules may have a reduced load rating, independent

   of the ULA load rating.  Please consult the PV module
   manufacturer’s installation guide for more information.

Tested Modules

Module

Manufacturer

Model/Series

Area 

[sqft]

UL2703 Certification

Load Ratings

Hyundai

HiS-S325TI

21.06

Down– 113 PSF, Up – 50 PSF

Down-Slope – 15 PSF

SunPower

SPR-P19-395-COM 22.20

Down– 113 PSF, Up – 50 PSF

Down-Slope – 15 PSF

First Solar

FS-6xxx-P

27.12

Down– 33.9 PSF, Up – 33.9 PSF

Down-Slope – 16.5 PSF

Содержание ULA

Страница 1: ...AL INSTALLATION GUIDE UNIRAC welcomes input concerning the accuracy and user friendliness of this publication Please write to publications unirac com UNIRAC Code Compliant Installation Manual 2021 by...

Страница 2: ...articular installations and installation environment Ensuring safe installation of all electrical aspects of the PV array SYSTEM COMPONENTS 1 3 SYSTEM LAYOUT 4 5 SYSTEM ASSEMBLY 6 7 MICROINVERTER MOUN...

Страница 3: ...ardware 1 U bolt 1 1 2 inch bolt and 2 flange nuts SOLARMOUNT OR GFT Rails SM Standard or GFT rails support PV modules Components and quantities specific to your installations are listed on your quota...

Страница 4: ...ICATIONS Rails caps sliders rail brackets cross braces bottom mounting clips and top mounting clamps 6105 T5 aluminum extrusion caps are welded Fasteners 304 stainless steel Horizontal and vertical pi...

Страница 5: ...L 302023D 7 SM ENDCLAMP E CLR AL 302024C 8 SM ENDCLAMP E DRK AL 302024D 9 SM ENDCLAMP F CLR AL 302025C 10 SM ENDCLAMP F DRK AL 302025D 11 SM ENDCLAMP K CLR AL 302026C 12 SM ENDCLAMP K DRK AL 302026D 1...

Страница 6: ...ers on page 2 of your Specs Sheet However if you needed to shift leg positions follow the east west spacing you set during your planning session The assembly sequence depends on installer preference a...

Страница 7: ...t be placed in standing water Prepare Vertical Pipes At the bottom of the vertical pipes install a piece of rebar threaded cap or bolts This step prevents withdrawal from the footing See figure 4 Pour...

Страница 8: ...SLIDER 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 A A B B C C D D IMAGE 1 BRACE CUT LENGTH IMAGE 2 INSTALL BRACE ON SLIDER IMAGE 3 INSTALL BRACE ON SLIDER IMAGE 4 INSTALL REAR CAP ON NORTH PIPE IMAGE 5 INSTALL H...

Страница 9: ...on to another slot IMAGE 1 CONFLICT 1 IMAGE 2 SOLUTION SHIFT BRACKET EW IMAGE 3 CONFLICT 1 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 A A B B C C D D IMAGE 1 CONFLICT 1 IMAGE 2 SOLUTION SHIFT BRACKET EW IMAGE 4...

Страница 10: ...nto top rail slot at microinverter locations Rotate bolts into position INSTALL MICROINVERTER Install microinverter on to rail Engage with bolt INSTALL MICROINVERTER Torque 1 4 nut to 10 ft lbs with A...

Страница 11: ...ss steel flat washer lock washer and nut Tighten the nut until the dimples are completely embedded into the rail and lug TORQUE VALUE 10 ft lbs See product data sheet for more details Model No WEEB LU...

Страница 12: ...Engage module frame with Endclamps Verify that the position indicator T bolt shaft are angled in the correct position TORQUE VALUE 1 4 nuts to 10 ft lbs w Anti Seize NOTE See appendix for additional...

Страница 13: ...st module frame Do not tighten nut until next module is in position Verify that the position indicator T bolt shaft are angled in the correct position INSERT MIDCLAMP T BOLT Apply Anti Seize and inser...

Страница 14: ...ALL ENDCLAMPS ApplyAnti Seize and install final Endclamps in same manner as first Endclamps Slide clamps against module TORQUE VALUE 1 4 nuts to 10 ft lbs w Anti Seize 1 2 MIN INSTALL REMAINING MID CL...

Страница 15: ...und connection NOTE Ilsco lug can also be used when secured to the side of the rail WEEBLUG OR ILSCO LUG SM RAIL SM RAIL 2 2 2 2 1 1 1 1 SM RAIL MICRO INVERTER FLANGE HEX NUT W CAPTIVE LOCK WASHER BON...

Страница 16: ...al Beam Horizontal Beam Rail Fault Current Ground Path Module Grounding Lug Rail Grounding Lug Bonding Mid Clamp Min 10 AWG 105 C Copper Wire Note Every array must have at least one grounding lug eith...

Страница 17: ...INSTALLATION GUIDE PAGE 15 Bonding Connections Grounding Paths Fault Current Ground Path Bonding Connection Optional Cross Brace Ground Note Cross bracing is optional for concrete foundation system Mi...

Страница 18: ...le Marking Label should be applied to the rail at the edge of the array Before applying the label the corners of the label that do not pertain to the system being installed must be removed so that onl...

Страница 19: ...ilder engineering report or stamped engineering package for information on mechanical load ratings spans and cantilevers Load ratings mentioned above are applicable for modules on table not on substru...

Страница 20: ...xxxP72 B ExxxM72 B ExxxH CM120 B ET Solar ET AC Module ET Module ET M772BH520 550WW WB Flextronics FXS xxxBB Manufacture Module Model Series Freedom Forever FF MP BBB xxx FF MP1 BBB xxx GCL GCL P6 GCL...

Страница 21: ...Use with a maximum over current protection device OCPD of 30A Unless otherwise noted all modules listed above include all wattages and specific models within that series Variable wattages are represen...

Страница 22: ...l modules Risen RSM Series RSM110 8 xxxBMDG S Energy SN72 SN60 Series Seraphim SEG 6PA 6PB 6MA 6MA HV 6MB E01 E11 SRP 6QA 6QB SRP xxx 6MB HV SRP 320 375 BMB HV SRP xxx BMC HV SRP 390 450 BMA HV SRP xx...

Страница 23: ...re may be applied to top or side of bracket as shown Do not force clamp into rail by pushing on bolt with excessive force INSTALL FIRST MODULE Install the first end module onto rails with the flange o...

Страница 24: ...LAMP ASSEMBLY Insert 1 4 T Bolt into top slot of rail INSTALL MIDCLAMPS Midclamp is supplied as an assembly with a T bolt for module installation Clamp assemblies may be positioned in rail near point...

Страница 25: ...position and that the top of the cap is sitting level with the module frame NOTE When installing 46mm modules loosen bolt by 1 turn before positioning clamp against module frame Do not force clamp ont...

Страница 26: ...to 15 ft lbs 2 Rotate clamp clockwise 2 3 of a turn to engage T bolt inside rail slot NOTE If excessive force is applied in step 2 the cap may over rotate causing it to be mis aligned with the module...

Отзывы: