Manual Pury 250e
Installation
Manual Pury 250e 2006-06-08
11
3.3.
Installing the condensate line
To allow all the condensate to be pumped out of the system the condensate line
must be always be above freezing point.
The Condensate pump is connected with a tube .runs from the condensate collection
container to the pump to an outside location. The condensate can be discharged or
pumped back into the process using locally sourced tubing.
All connections must be checked for leaks.
The mechanical installation of the Pury 250E is now complete.
3.4. Electrical
connections
Prior to commissioning, please first check the power supply voltage matches with the
voltage specified on the specification rating plate.
Remove the 4 attachment screws on the enclosure to gain access to the connection
terminals.
The enclosure cover should be removed and the power supply cable passed through
the PG cable glands and connected to the unit as shown in the terminal block
drawing. After power is applied the system will start operating, the cooling system will
start and the cooling fan will begin to draw air through the enclosure.
As standard, 230 V 50 Hz AC is supplied but. other voltages, e.g. 115 Volt 60 Hz are
available on request. The operating voltage must be specified prior to delivery as the
units are voltage specific and not switchable in the field.
Содержание Pury 250e
Страница 1: ...Users Manual Pury 250e Gas Purification System ...
Страница 6: ...Introduction Manual Pury 250e 6 Manual Pury 250e 2006 06 08 ...
Страница 8: ...Installation Manual Pury 250e 8 Manual Pury 250e 2006 06 08 ...
Страница 14: ...Commissioning Manual Pury 250e 14 Manual Pury 250e 2006 06 08 ...
Страница 18: ...Maintenance Manual Pury 250e 18 Manual Pury 250e 2006 06 08 ...
Страница 22: ...Circuit Diagrams Manual Pury 250e 22 Manual Pury 250e 2006 06 08 ...