Transport, setup and acceptance
22
5.4.2 Process gas
NOTE
•
The connecting parts need to be clean and free of residue. Impurities can
enter the process gas analyser and cause incorrect measurements and/or
damage.
•
The inlet pressure for the gas connections must not exceed the pressure
specified on the instruction sticker on the process gas analyser.
•
Each connection needs to be carefully checked for leaks. If there are any
leaks, the system will draw air, and the measurements will be incorrect.
•
Do not use sealing compound to seal the gas connections. Sealing compound
can distort measurements. Use PTFE sealing tape.
•
Only use suitable pipes.
•
Use a separate line to drain off the condensate.
ATTENTION
The process gas must be free of condensate and dust if the process gas analyser
has no gas preparation system (or gas cooler).
Содержание INCA1021
Страница 1: ...Apr 2016 V1 10 Translation of the original operating instructions Process gas analyser INCA1021 ...
Страница 3: ...3 Dimensions ...
Страница 10: ...EU Declaration of Conformity 10 ...
Страница 16: ...Safety equipment 16 3 2 Markings and warnings Fig 3 1 Markings and warnings 1 Type plate 1 ...
Страница 44: ...Operation 44 ...
Страница 46: ...Decommissioning switching off 46 ...
Страница 50: ...Maintenance 50 ...
Страница 54: ...Service 54 ...
Страница 56: ...Associated documents 56 ...
Страница 58: ...Disposal 58 ...
Страница 60: ...Spare parts 60 ...
Страница 61: ...61 16 Annex ...
Страница 62: ...Annex 62 EU Declaration of Conformity Flame arrester ...
Страница 63: ...Annex 63 ...