Page 8
INSTALLATION
Your Union Tool Roller Coater is easy to install.
1. Remove the coater from the skid. Depending on the size, the coater could
be very heavy so please make a note of the shipping weight and use the
proper equipment. Lift from the bottom of the frame. Be sure that the lift forks
are against the frame when lifting the coater from the wooden skid.
2. Place the coater in the chosen position.
3. Level the coater.
4. Make the power drop to the disconnect box. The voltage should be clearly
marked on the front of the disconnect box and on the electrical print inside the
box.
5. Make an air drop to the coater if the coater is equipped with a filter and
regulator.
Please do not reduce the size of the lines of the air drop
smaller than the supplied filter and regulator.
Make a visual check between the coating rolls and doctor rolls; look for any
loose objects that may have fallen between the rolls. Check the rotation of the
coating and doctor rolls in the reverse mode. All guards and covers must be in
position for the coater to operate.