CIB UNIGAS - M039168CC
14
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Key
ATTENTION:
BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE
MANUAL CUTOFF VALVES ARE CLOSED.
Gas train - 1
: Gas train with valves group VGD 20/40 with built-in gas pressure go VPS504 gas proving system
Gas train 2
(DN65/80/100): Gas train with valves group MBC 1900/3100/5000SE (2 gas pressure go
pressure switch) + VPS504 gas proving system
1
Burner
2
Butterfly valve
3
Gas proving system
4
Maximum gas pressure switch (optional)
5
Minimum gas pressure switch
6
Gas filter
7
Bellow joint
8
Manual cutoff valve
11
VGD Valves group
14
Pressure governor with filter
15
Pilot gas valve
19
MBC Valves group (DN65/80/100)
1
2
4
5
6
7
8
11
15
15
4
7
8
14
3
MANUFACTURER
INSTALLER
1
2
3
5
4
7
8
15
15
4
7
8
14
6
19
MANUFACTURER INSTALLER
Содержание TP1030
Страница 37: ...C I B UNIGAS M039168C 37 ...
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 58: ......
Страница 59: ......