PART II: INSTALLATION
15
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Key
WARNING: BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE
MANUAL CUTOFF VALVES ARE CLOSED.
Gas train with valves group MB-DLE (2 gas pressure governor)
Gas train with valves group VGD with built-in gas pressure governor
1
Filter 6
Butterfly
valve
2
Pressure switch - PGMIN
8
Main burner
3
Safety valve with built in gas governor 9
Manual
valve(*optional)
5
Pressure switch - PGMAX (*optional)
10
Bellows unit(*optional)
GAS INLET
BY BURNER CONSTRUCTOR
BY OTHERS
GAS INLET
SUPPLIED BY BURNER
CONSTRUCTOR
BY OTHERS
Содержание RX63
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 45: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 3 01 2017...
Страница 52: ...8 Parameters level heating engineer...
Страница 94: ...50 ERROR CODE TABLE...
Страница 95: ...51...
Страница 96: ...52...
Страница 97: ...53...
Страница 98: ...54...
Страница 99: ...55...
Страница 100: ...56...
Страница 101: ...57...
Страница 102: ...58...
Страница 103: ...59...
Страница 104: ...60...
Страница 105: ...61...
Страница 106: ...62...
Страница 107: ...63...
Страница 108: ...64...
Страница 110: ...66 Wiring variants for LMV27 2 Fuel meter input 1 Supply fuel meter ConnectorX75 ConnectorX5 02 ConnectionsPmax...
Страница 113: ......
Страница 114: ......
Страница 115: ......
Страница 117: ...IG FU B...
Страница 118: ......
Страница 119: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 126: ......
Страница 127: ......