PART III: OPERATION
35
MultiBloc MBE
MultiBloc VD Mounting
position
to push
1. Position VD on VB, fig. 2+3.
2. Slide VD forward up to the stop, fig. 4.
3. Screw VD on with 2 M5 screws for each, max. 5 Nm/44 in.-lb., fig. 5/6.
4. VD can be mounted rotated by 180°, fig. 7.
1
2
3
4
5
6
7