background image

PART II: INSTALLATION

16

Mounting VD-R & PS-...

Siemens VGD20.. e VGD40..

 

Siemens VGD20.. and VGD40..  gas valves - with SKP2.. (pressure governor) 

- Connect the reference gas pipe (

TP

 in figure; 8mm-external size pipe supplied loose), to the gas pressure nipples placed on the gas

pipe, downstream the gas valves:  gas pressure must be measured at  a distance that must be at least 5 times the pipe size.

- Leave the blowhole free (

SA

 in figure). Should the spring fitted not permit satisfactory regulation, ask one of our service centres for a

suitable replacement.

1. Gas pressure regulation is possible with VD-R and PS pressure sensor only.

WARNING! For US/CN installation, the output pressure must be monitoried by min. and max. pressure switches set

to +/- 20% of the setpoint.

2. Mounting on pipe. Sensor position: 5x DN according to MBE. Pipe fitting with female thread size ¼, mount sensor with

seal, observe torque.

3. The pressure sensor includes a vent limiter according to UL 353 and ANSI Z21.18/CSA 6.3. No venting required in loca-

tions where vent limiters are accepted by the jurisdiction.

4. Only PS pressure sensors specified by DUNGS are authorised to be connected to the VD-R‘s M12 interface.
5. Only PS cables specified by DUNGS are authorised to be used to connect the PS to the VD-R. Max. cable length 3 m.

Caution: the SKP2 diaphragm D must be vertical

WARNING: removing the four screws BS causes the device to be unserviceable!

Actuator

VD-R

The actuator 

VD-V

 does not need any adjustment (funzione ON-OFF)

The actuator 

VD-R

 It must be combined with the 

PS

 sensor (include 

regolatore di pressione)

Actuator

VD-V

M12 x 5 Pin

VD-R + PS

Содержание K750A

Страница 1: ...M039462NB 0 1 11 2021 BURNERS BRUCIATORI BRULERS BRENNER QUEMADORES K750A K890A K990A...

Страница 2: ...2 1 CO 2 a a RESET 3 3a...

Страница 3: ...1 1 CEI EN 60335 2 102 2 102 UNI EN ISO 12100 2010 2014 35 UE 2014 30 UE 2006 42 CE UNI EN 267 EN 55014 1 EN 60204 1 2006 CEI EN 60335 1 1 CEI EN 60335 2 102 2 102 UNI EN ISO 12100 2010 2014 35 UE 201...

Страница 4: ...1 1 CEI EN 60335 2 102 2 102 UNI EN ISO 12100 2010 2014 35 UE 2014 30 UE 2006 42 CE UNI EN 676 EN 55014 1 EN 60204 1 2006 CEI EN 60335 1 1 CEI EN 60335 2 102 2 102 UNI EN ISO 12100 2010 2014 35 UE 20...

Страница 5: ...e is detected by a sensor that can be an ionization or UV or IR sensor Failing which a safety interlock is tripped From now on flame detection will be continuous until the burner is switched off At th...

Страница 6: ...M K750A L K890A L K990A L 880 7500 1000 8900 1820 9900 880 7500 1000 8900 1820 9900 M L I3B P 3 93 794 106 942 193 1048 2 25 280 37 332 68 370 220 230 3 380 400 3N 50 AUX 220 230 2 220 230 1N 50 15 5...

Страница 7: ...bbe index of 43 46 45 3 MJ m3 dry 0 C upper value or 41 23 42 98 dry 15 C upper value This appliance can moreover be converted and or be calibrated for the appliance category E I2E This therefore impl...

Страница 8: ...x x 25 x 611 117 530 626 1310 524 1695 969 726 400 440 494 540 690 M16 651 460 460 460 636 150 487 845 292 960 328 270 80 1840 366 x x 25 x 626 132 530 626 1310 524 1728 1002 726 400 440 494 540 690...

Страница 9: ...range of the machine On this diagram the maximum output point is usually reached by adjsuting the combustion head to its To check the proper gas train size it is necessary to the available gas pressur...

Страница 10: ...ctuator are at the maximum opening Refer to showing the correct way to measure the gas pressure considering the values of pressure in combustion chamber surveyed by means of the pressure gauge or take...

Страница 11: ...h quoted on the x axis from the pressure measured in the combu stion head quoted on the y axis The data obtained must be considered when adjusting the gas flow rate Pressure rate in combustion head c...

Страница 12: ...dling operations must be carried out with appropriate resources and qualified personnel ATTENTION Use intact and correctly dimensioned hoisting equipment conforms to the local regulations and health a...

Страница 13: ...e supplier to verify that a correct matching is possible with respect of the application involved To correctly match the burner to the boiler verify the type of the blast tube Verify the necessary inp...

Страница 14: ...unt the gas train proceed as follows NOTE the bellows unit the manual cutoff valve and the gaskets are not part of the standard supply WARNING before executing the connections to the gas pipe network...

Страница 15: ...UCIATORE 185 501939 PGMAX PGCP PGMI EV1 EV2 S EV2 EV1 PGMAX PGMIN VD R PGCP VD V VD V VD R PS PS pressure sensor Gas filter Example of gas train MBE A A C B B C 1 Mount flange into pipe systems Use ap...

Страница 16: ...pressure switches set to 20 of the setpoint 2 Mounting on pipe Sensor position 5x DN according to MBE Pipe fitting with female thread size mount sensor with seal observe torque 3 The pressure sensor i...

Страница 17: ...r in order to prevent dust fall on the safety valve during maintenance operation SA SA TP D BS SKP1 SKP2 SIEMENS VGD Mounting positions T VR Performance range mbar neutral yellow red Spring colour SKP...

Страница 18: ...r a preset time test time td1 The pressure switch PGCP has not to detect a rise of pressure Test space filling EV1 opens and keep this position for a preset time td3 in order to fill the test space Te...

Страница 19: ...RC circuit Siemens between the terminal 2 terminal X3 04 4 in case of LMV2x LMV3x LMV5x LME7x of the base and the earth terminal RC466890660 For LMV5 control box please refer to the clabeling recomme...

Страница 20: ...s and with a signal in 0 10V controls it through the inverter Generally the curve of the inverter goes from 50 to 100 of the engine revolutions This in addition to improving the setting of the burner...

Страница 21: ...E MACHINE EXCEPT FOR ITS MAINTENANCE TO SECURE THE MACHINE ACT ON THE ISOLATOR SWITCH IN CASE OF ANOMALIES THAT REQUIRED A SHUT DOWN OF THE BURNER IT S POSSIBLE TO ACT ON THE AUXILIARY LINE SWITCH LOC...

Страница 22: ...re purgue phase must be carried out with the maximum air rate the control box drives the actuator opening and when the maximum opening position is achieved the pre purge time counting starts At the en...

Страница 23: ...e low flame microswitch of the actuator in order to avoid the low flame output increasing too much or that the flues temperature gets too low to cause condensation in the chimney To change the burner...

Страница 24: ...that the actuator moves progressively towards the low flame position 13 move the gas low flame microswitch to the minimum to move the actuator towards the low flame until the two bearings find the adj...

Страница 25: ...ious paragraphs about the progressive burners Go on adjusting the burner as described before paying attention to use the CMF switch intead of TAB The CMF position sets the oprating stages to drive the...

Страница 26: ...nts do not exceed a value that creates a hazardous condition to the burner Adjusting output pressure for positive pressure systems requires PS 10 40 or PS 50 200 Outlet pressure MIN 10 25 50 75 MAX PS...

Страница 27: ...ed To calibrate the maximum pressure switch proceed as follows according to its mounting position remove the pressure switch plastic cover if the maximum pressure switch is mounted upstreaam the gas v...

Страница 28: ...HE FUEL MANAUL CUTOFF VALVES CLOSED ATTENTION READ CAREFULLY THE WARNINGS CHAPTER AT THE BEGINNIG OF THIS MANUAL DANGER Incorrect motor rotation can seriously damage property and injure people ATTENTI...

Страница 29: ...he VRT ring nut Fasten VB screw when the adjustment is accomplished Attention if it is necessary to change the head position repeat the air and fuel adjustments described above CAUTION perform these a...

Страница 30: ...tory setting depends on the type of fuel for which the burner is designed For natural gas burners plate holes are fully opened Center head holes gas flow regulation LPG burners To adjust the gas flow...

Страница 31: ...wing the reversed procedure Caution adjust the nozzle position according to the air pipe by means of the VU screw ance the VL screw is fastened Remove the burner cover C Remove the electrode cables Un...

Страница 32: ...ssary an overall repair The burner status is considered to be at its limit if it is technically impossible to continue using it due to non compliance with safety requirements or a decrease in performa...

Страница 33: ...URNER LOCKS OUT WITHOUT ANY GAS FLOW Gas valves don t open Check voltage on valves if necessary replace valve or the burner control Check if the gas pressure is so high that the valve cannot open Gas...

Страница 34: ...34...

Страница 35: ......

Страница 36: ...im cibunigas com 690002 1 206 7 914 726 34 74 e mail vostok cibunigas com 3940298 55 3 7 920 429 11 39 email echin sergey cibunigas com 02002 9 38 067 464 82 36 38 067 465 41 11 e mail unigas ukr net...

Страница 37: ...LME73 000Ax PME73 831AxBC LME73 831AxBC M12921NB Rel 1 2 02 2016...

Страница 38: ...2 LME7 hardware LME73 000 software EEPROM PME73 831AxBC LME73 831AxBC EEPROM software LME7 LME73 LME73 QRA2 QRA4 U QRA10 LME73 BCI Info LED 3 7 LED 24 BCI...

Страница 39: ...3 A Info Enter Reset 2 MMI 1 MMI LED SU PME PME 1 PME 2 LME rst PrC 3 INFO 3 run LME 4 End rst 2 Loc 138 5 INFO 3 LME OFF 1 PME 2 2...

Страница 40: ...F Off P08 Off ON P21 ON POC P22 ON P24 P30 P36 P38 P40 1 TSA1 ON P42 OFF P44 1 V1 ON LR P50 2 TSA2 P54 P259 01 P54 P260 oP1 3 oP P10 CLOSE P72 P74 P80 P81 1 P82 P83 2 start prevention P01 P02 P04 time...

Страница 41: ...5 Info EK LME73 I LED EK LED 1 2 2 LED tw OFF OK OK T Led Led Led Led Led...

Страница 42: ...6 1 515 1 259 01 0...

Страница 43: ...7 2 515 1 259 01 0...

Страница 44: ...10 21 22 1 2 t10 LP 24 30 1 t1 2 t1 36 38 t3 40 t3n 257 0 3 42 44 t4 TSA 2 50 t9 54 259 01 260 72 LT 74 t8 80 T td4 81 td1 1 V1 82 td3 83 T td2 2 V2 90 P 1 241 00 1 241 02 1 241 00 1 241 01 0 2 241 00...

Страница 45: ...9 2 x TSA 3 x LP t10 LP 4 x 5 x LP LP 6 x 7 x 8 x 9 x 10 x 12 x LT 1 V1 13 x LT 2 V2 14 x POC 15 x 15 22 SL AL X2 03 pin 3 Info 1 3...

Страница 46: ...10 1 A DC 2 A 45 DC 3 A 100 30 100 C 100 470 DC 10 25 V ION M Ri 5 000 QRA start prevention 954 12 954 13 280 V 15 50 60 6 70 A 700 A 100 A C 100 470 DC 10 25 V M Ri 5 000 QRA X10 06 2 QRA QRA LME7...

Страница 47: ...11 X2 02 ON OFF NO ON NC OFF P LT 1 td4 2 81 td1 T P LT X9 04 3 82 td3 4 83 td2 P LT X9 04 td1 td2 T td3 td4 V P LT 1 ON 0 OFF 1 ON 0 OFF 242 243 244 245...

Страница 48: ...12 2x 23 21 23 F A code Service OEM info enter Info Service enter reset ESC...

Страница 49: ...13 Info LME73 Info Service...

Страница 50: ...h08 ON Ph21 ON POC Ph22 ON Ph24 Ph30 Ph36 Ph38 Ph40 1 TSA1 ON Ph42 OFF Ph44 1 V1 ON LR Ph50 2 TSA2 Ph54 P259 01 Ph54 P260 oP1 3 oP Ph10 CLOSE Ph72 Ph74 Ph80 Ph81 1 Ph82 Ph83 2 start prevention Ph01 Ph...

Страница 51: ...15 2x T Loc 2 TSA Loc 3 LP t10 LP t10 LP Loc 4 Loc 5 LP LP Loc 6 Loc 7 Loc 8 Loc 9 Loc 10 Loc 12 1 V1 Loc 13 2 V2 Loc 22 Loc 138 Loc 167 Loc 206 2...

Страница 52: ...16...

Страница 53: ...831AxBC LME73 831AxBC 100 102 Info 103 0 9999 1 Info 113 x xxxxxxxx 1 Info 164 0 999999 1 Info Info 166 0 999999 1 Info 170 00 K12 0 999999 1 Info 170 01 K11 0 999999 1 Info 170 02 K2 0 999999 1 Info...

Страница 54: ...C 700 701 Service 00 2 255 1 01 0 999999 1 02 03 0 100 1 702 1 Service 00 2 255 1 01 0 999999 1 02 03 0 100 1 711 10 Service 00 2 255 1 01 0 999999 1 02 03 0 100 1 900 936 0 100 0 01 Service 951 0 V L...

Страница 55: ...e Backup SO 100 123 1 10 0 1 SO SO 140 2 1 4 1 SO SO 1 2 1 QRA ION 3 2 QRB QRC 4 200 224 t10 LP 0 13 818 0 294 12 054 SO OEM 225 t1 0 1237 4 851 29 106 SO OEM 226 t3 1 029 37 485 0 147 2 058 SO OEM 23...

Страница 56: ...2 648 0 147 2 646 SO OEM 245 1 029 37 485 0 147 10 290 SO OEM 254 0 1 1 0 SO OEM 0 1 1 3 257 t3n 0 3 0 13 23 0 147 2 205 SO OEM 259 00 t11 0 1237 4 851 67 914 SO OEM 259 01 0 37 485 0 147 14 994 SO O...

Страница 57: ...21 41 42 60 123 140 242 243 244 245 259 01 SO OEM LME73 831AxBC...

Страница 58: ......

Страница 59: ......

Страница 60: ...35 7 7 861 234 08 44 email velikotskiy roman cibunigas com 410002 7 339 7 912 201 96 69 email nikonenko vadim cibunigas com 690002 1 206 7 914 726 34 74 e mail vostok cibunigas com 3940298 55 3 7 920...

Страница 61: ...07 2019 28 07 2024 RU C IT MX17 B 00535 N 0726892 08 08 2018 07 08 2023 RU C IT MX17 B 00063 19 N 0101958 29 07 19 28 07 2024 RU C IT MX17 B 00564 N 0779952 03 12 2018 02 12 2023 RU C IT MX17 B 00062...

Страница 62: ......

Страница 63: ......

Страница 64: ......

Страница 65: ......

Страница 66: ......

Страница 67: ......

Страница 68: ......

Страница 69: ......

Страница 70: ......

Страница 71: ......

Страница 72: ......

Страница 73: ......

Страница 74: ......

Страница 75: ......

Страница 76: ......

Отзывы: