15
Gas train connections
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Keys
1 Burner
2 Butterfly valve
3 Gas proving system
4 Maximum gas pressure switch (option)
5 Minimum gas pressure switch
6 Gas filter
7 Bellow joint
8 Manual cutoff valve
10 VGD Valves group
16 PGCP gas leakage pressure switch
18 MBC Valves group (2” with built-in filter)
19 MBC Valves group (DN65/80/100)
ATTENTION:
BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE
MANUAL CUTOFF VALVES ARE CLOSED.
Gas train - 4
- Gas train with valves group VGD 20/40.. with built-in gas pressure go PGCP gas leakage pressure switch
1
2
5
4
6
7
8
11
16
4
MANUFACTURER
INSTALLER
Содержание HTP90A
Страница 33: ...33 Fig 16...
Страница 54: ...54...
Страница 56: ...56...
Страница 57: ...57...
Страница 58: ......
Страница 59: ......
Страница 61: ...LME73 000Ax PME73 831AxBC LME73 831AxBC Service instruction manual M12921CB Rel 1 2 02 2016...
Страница 83: ...23...
Страница 84: ...Note Specifications and data subject to change Errors and omissions excepted...