![Unigas HP20 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/unigas/hp20/hp20_manual-of-installation-use-maintenance_842293010.webp)
C.I.B. UNIGAS
- M039203CC
10
MOUNTINGS AND CONNECTIONS
Packing
Burners are despatched in cardboard packages whose dimensions are:
1280mm x 850mm x 760mm (L x P x H)
Packing cases of this kind are affected by humidity and are not suitable for stacking. The fol-
lowing are placed in each packing case:
z
burner with gas train detached;
z
gasket to be inserted between the burner and the boiler;
z
flexible oil pipes;
z
oil filter;
z
envelope containing this manual
To get rid of the burner’s packing, follow the procedures laid down by current laws on disposal of
materials
Handling the burner
The burner is mounted on a stirrup provided for handling the burner by means of a fork lift truck: the forks must be inserted into the A
anb B ways. Remove the stirrup only once the burner is installed to the boiler.
Fitting the burner to the boiler
To install the burner into the boiler, proceed as follows:
1
make a hole on the closing door of the combustion chamber as described on paragraph “Overall dimensions”;
2
place the burner to the boiler: lift it up and handle it according to the procedure described on paragraph “Handling the burner”;
3
place the 4 stud bolts (5) on the hole of the boiler’s door, according to the burner’s drilling plate described on paragraph “Overall
dimensions”;
4
fasten the 4 stud bolts;
5
place the gasket on the burner flange;
6
install the burner into the boiler;
7
fix the burner to the stud bolts, by means of the fixing nuts, according to the next picture.
8
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate
insulating material (ceramic fibre cord or refractory cement).
The burner is designed to work positioned according to the picture below. For different installations, please contact the Technical
Department.
ATTENTION! The lhandling operations must be carried out by specialised and trained personnel. If these opera-
tions are not carried out correctly, the residual risk for the burner to overturn and fall down still persists.
To move the burner, use means suitable to support its weight (see paragraph “Technical specifications”).
The unpacked burner must be lifted and moved only by means of a fork lift truck.
H
P
L
A
B
Keys
1
Burner
2
Fixing nut
3
Washer
4
Sealing gasket
5
Stud bolt
7
Blast tube
Содержание HP20
Страница 35: ...C I B UNIGAS M039203CC 35 ...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 59: ......