PART II: INSTALLATION
13
MOUNTING AND CONNECTING THE BURNER
Transport and storage
If the product must be stored, avoid humid and corrosive places. Observe the temperatures stated in the burner data table at the begin-
ning of this manual. The packages containing the burners must be locked inside the means of transport in such a way as to guarantee
the absence of dangerous movements and avoid any possible damage.
In case of storage, the burners must be stored inside their packaging, in storerooms protected from the weather. Avoid humid or corro-
sive places and respect the temperatures indicated in the burner data table at the beginning of this manual.
Handling the burner
The burner is provided with eyebolts, for handling operations and it can be lifted
with a hydraulic lift or a small manual crane. (A)
ATTENTION! The equipment must be installed in compliance with the regulations in force, following the manufac-
turer’s instructions, by qualified personnel. All handling operations must be carried out with appropriate
resources and qualified personnel
ATTENTION: Use intact and correctly dimensioned hoisting equipment, conforms to the local regulations and
health and safety regulations. Do not stand under lifted loads.
Packing
Burners are despatched in cardboard packages whose dimensions are:
1636mm x 1036mm x 1016mm (L x P x H).
Packing cases of this type are affected by humidity and are not suitable for stacking.
The following are placed in each packing case:
burner with detached gas train;
gasket or ceramic fibre plait (according to burner type) to be inserted between the burner
and the boiler;
(if provided) detection photoelement deatached from the burner
envelope containing this manual and other documents.
To get rid of the burner’s packing, follow the procedures laid down by current laws on disposal
of materials.
WARNING! The handling operations must be carried out by spe-
cialised and trained personnel. If these operations are not carried
out correctly, the residual risk for the burner to overturn and fall
down still persists.
PART II: INSTALLATION
H
P
L
Eyebolts
Ø 12 mm
A
Содержание E165A
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 49: ...FRONTALE QUADRO FRONT CONTROL PANEL...
Страница 50: ...FRONTALE QUADRO FRONT CONTROL PANEL...
Страница 51: ......
Страница 52: ......