SIEMENS LME11/21/22 CONTROL BOX
Preconditions for burner startup
z
Burner control must be reset
z
All contacts in the line are closed, request for heat
z
No undervoltage
z
Air pressure switch LP must be in its “no-load” position
z
Fan motor or AGK25 is closed
z
Flame detector is darkened and there is no extraneous light
Undervoltage
Safety shutdown from the operating position takes place should mains
voltage drop below about AC 175 V (at UN = AC 230 V)
Restart is initiated when mains voltage exceeds about AC 185 V (at UN =
AC 230 V).
Controlled intermittent operation
After no more than 24 hours of continuous operation, the burner control
will initiate automatic controlled shutdown followed by a restart.
Reversed polarity protection with ionization
If the connections of live conductor (terminal 12) and neutral conductor
(terminal 2) aremixed up, the burner control will initiate lockout at the end
of the safety time “TSA”.
Control sequence in the event of fault
If lockout occurs, the outputs for the fuel valves, the burner motor and the
ignition equipment will immediately be deactivated (< 1 second).
Operational status indication
In normal operation, the different operating states are showed by means
of the multicolor LED, inside the lockout reset button:
During startup, status indication takes place according to the table:
START-UP PROGRAM
As far as the startup program, see its time diagram:
A
Start command (switching on)
This command is triggered by control thermostat / pressure controller
«R». Terminal 12 receives voltage and the programming mechanism
starts running. On completion of waiting time «tw» with the LME21..., or
after air damper «SA» has reached the nominal load position (on comple-
tion of «t11») with the LME22..., fan motor «M» will be started.
tw
Waiting time
During the waiting time, air pressure monitor «LP» and flame relay «FR»
are tested for correct contact positions.
t11 Programmed opening time for actuator «SA»
(Only with LME22...) The air damper opens until the nominal load position
is reached. Only then will fan motor «M» be switched on.
t10 Specified time for air pressure signal
On completion of this period of time, the set air pressure must have built
up, or else lockout will occur.
t1
Prepurge time
Purging the combustion chamber and the secondary heating surfaces:
required with low-fire air volumes when using the LME21... and with nomi-
nal load air volumes when using the LME22.... The diagrams show the so-
called prepurge time «t1» during which air pressure monitor «LP» must
indicate that the required air pressure is available. The effective prepurge
time «t1» comprises interval end «tw» through «t3».
t12 Programmed closing time for actuator «SA»
(Only with LME22...)During «t12», the air damper travels to the low-fire
position.
t3 Preignition time
During «t3» and up to the end of «TSA», flame relay «FR» is forced to
close. On completion of «t3», the release of fuel is triggered at terminal 4.
TSA Ignition safety time
On completion of «TSA», a flame signal must be present at terminal 1.
That flame signal must be continuously available until shutdown occurs,
or else flame relay «FR» will be deenergized, resulting in lockout.
t4 Interval BV1 and BV2-LR
Time between the end of TSA and the signal to the second fuel valve BV2
or to the load controller LR
B - B'
Interval for flame establishment
C
Burner operation position
C - D
Burner operation (heat production)
D
Controlled by "R" shutdown
The burner stops and the control device is ready for a new startup.
red LED
yellow LED
green LED
Steady on
Off
Status
Color code
Color
Waiting time tw, other
waiting states
Off
Ignition phase, ignition
controlled
Flashing yellow
Operation, flame ok
Green
Operation, flame not
ok
Flashing green
Extraneous light on
burner startup
Green - red
Undervoltage
Yellow - red
Fault, alarm
Red
Error code output
(refer to “Error code
table”)
Flashing red
APPENDIX
LED
Y
........
...
.....................................
z z z z z z
......................................
S
S
S
S
S
z
S
z
S
z
S
z
S
z
S
S
.....................................
S
S
S
S
Содержание C85A
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 53: ...FRONTALE QUADRO FRONT CONTROL PANEL ...
Страница 54: ...FRONTALE QUADRO FRONT CONTROL PANEL ...
Страница 55: ......
Страница 56: ......