background image

Care, maintenance and overhaul

EKZT-Series | Version 1.04

13

Step 1:     Lubricate all moving parts of the chain hoist 

(gearbox, bearings) with high-quality grease. 
Oil the chain well

Step  2:    Check the chain hoist for external damage be

-

fore each use.

Step 3:     Make sure that all safety instructions on the 

chain hoist are clearly legible.

Visual inspection and maintenance

 

Control of the brake system:

 

Brake tests are to be carried out as follows: 

Step 1:  Attach load

Step 2:  Lifting the load

Step 3:  Raise and lower load at different heights

Step 4:  Test whether it is possible to hold the load in any 

position

 

Checking the load chain for wear

Continuous monitoring of the load chain is a mandatory 
requirement in accordance with DIN 685 Part 5 or UVV 
DGUV regulation 54 (BGV D8 § 27 (VBG 8 § 27).) The 
load chain must be started after commissioning and un

-

der normal operating conditions after approx. 10,000 
load cycles, to be tested at shorter intervals in severe 
conditions.

The links, especially at the points of contact, are to be 
checked for wear, cracking, deformation and other da

-

mage. 

The chain is to be renewed at: 

- Reduction of the nominal thickness at the points of 

contact by 10% or, if worn to the limit value in the 
table Fig. 5.

- Elongation of a limb by 10% or of the chain over 11 

limbs by 4% or, when stretched to the limit value in 
the table Fig. 5.

- rigid-drawn chain links 

When changing the chain, check the chain guide and re

-

place if necessary.

 

main

-

tenance-
intervall 

maintenance work

before every 
use

Check the chain hoist for damage 
and wear, especially the chain links 
for bending, stretching, cracks and 
corrosion 

Check brake for damage and wear. 
Clean brake disc if necessary, re

-

place if heavily worn.

Check the load hook and carrying 
hook for wear or loss of substance by 
grinding. If the wear exceeds 10% of 
normal on delivery, the hook must be 
replaced.

after each 
use

Thoroughly clean the chain hoist and 
lubricate well. Lubricate the load 
chain and the load hook and carrying 
hook well.

40 hours

Lubricate transmission and bearings 
well. 

40 hours

Function check of the brake

40 hours

Cleaning the brake disc

200 hours

Wear test and wear measurement of 
the brake disc

200 hours

Wear test and wear measurement of 
the chain links and the load and car

-

rying hook

upon need

Replacement of the brake disc

upon need

Replacement of the chain links and 
the load and carrying hook.

yearly

Safety check: If the chain hoist is 
used in companies, it must be tested 
annually according to the German In

-

dustrial Safety Ordinance and the test 
must be documented in accordance 
with § 10. 

ATTENTION!

Check the brake system regularly!

ATTENTION!

The brake discs must be replaced if the disc thick

-

ness is reduced by 10% or more, or if it is no longer 
possible to maintain the load in any position.

The replacement of the brake disc may only be car

-

ried out by the customer service.

ATTENTION!

As spare chain use only original spare chain from the 
manufacturer of the hoist.

Содержание EKZT 10-1

Страница 1: ...EKZT S ERIES EKZT 5 2 Operating Instructions Electric Chain Hoist EKZT 5 1 EKZT 5 2 EKZT 10 1 EKZT 10 2 EKZT 20 1 EKZT 20 2...

Страница 2: ...Safety 3 2 1 Symbol explanation 3 2 2 Obligations of the operating company 4 2 3 Requirements to staff 5 2 4 Personal protective equipment 5 2 5 General safety regulations 6 2 6 Safety information for...

Страница 3: ...nce and knowledge gained from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes in these opera...

Страница 4: ...r correspond to the current status of the regulations and must adapt these if necessary The operating company must unambiguously reg ulate and determine the responsibilities for instal lation operatio...

Страница 5: ...ur cus tomer service for the execution of all arising work 2 4 Personal protective equipment The personal protective equipment serves to protect per sons against impairments of safety and health while...

Страница 6: ...tenance or repair is complete 2 7 Safety marking on the electric chain hoist The following safety marking is attached to the electric chain hoist fig 1 which must be observed and follo wed Fig 1 Safet...

Страница 7: ...ich prevent any accidents or damage caused by these re si dual risks Risk of crushing of upper and lower limbs while equipment is operating During set up and adjustment works it may be come necessary...

Страница 8: ...s should be ta ken to a collection point for recyclable materials or to the local waste disposal company 5 3 Storage Oil the electric chain hoist and store it in a frost free and dry environment Do no...

Страница 9: ...arrow clockwise 2 Key ON Kettenzug einschalten 3 Position OPEN Lift the load upwards 4 Position AB Lift the load upwards 5 Position LEFT Move landing gear to the left 6 Position RIGHT Move landing ge...

Страница 10: ...always be suspended from suitable equipment which has sufficient load bear ing capacity to withstand the weight of the load and the chain hoist If the load bearing capacity is exceeded the chain hoist...

Страница 11: ...that the safety of the hook is closed Step 2 Press the button OPEN and initially drive only until the load chain is tensioned Step 3 First lift the load only a short distance and check that the chain...

Страница 12: ...to the actual signs of wear If you have questions about maintenance work and intervals contact the manufactu rer The contact details can be found in chapter 1 2 Cu stomer Service If the electric chai...

Страница 13: ...ing the chain check the chain guide and re place if necessary main tenance intervall maintenance work before every use Check the chain hoist for damage and wear especially the chain links for bending...

Страница 14: ...severe condi tions e g frequent operation with full load dusty or ag gressive environment high switching frequency high switch on duration the test distances must be shorte ned Experts for the inspec...

Страница 15: ...cause Solution Chain hoist motor is not functioning 1 Inadequate power supply 2 Wrong phase conductor 3 Switch defective 4 Rectifier defective 5 Transformer defective 6 Motor defective 1 Check power...

Страница 16: ...and year of construction on the type plate which is fi xed on the compressor Example The support hook for the EKZT 5 1 must be ordered The carrying hook has the position number 26 in the spare part dr...

Страница 17: ...2 Spare parts drawing In case of service the following drawing shall help to identify the necessary spare parts If necessary send a copy of the parts drawing with the marked components to your author...

Страница 18: ...al wiring diagram 13 Electrical wiring diagram EKZT 5 1 EKZT 10 1 EKZT 20 1 Fig 9 Electrical wiring diagram EKZT Models with a lifting speed EKZT 5 2 EKZT 10 2 EKZT 20 2 Fig 10 Electrical wiring diagr...

Страница 19: ...es with all relevant provisions of the above mentioned directive as well as the other applied directives below including their applicable modifications at the time of the declaration Relevant EU direc...

Страница 20: ...40 h 200 h when nee ded 200 h when nee ded yearl y bearings gears lubricate unction check braking system Cleaning brake disc Check for wear brake disc Replacement brake disc Measurement of wear Chain...

Страница 21: ...when nee ded 200 h when nee ded yearl y bearings gears lubricate function check braking system Cleaning brake disc Check for wear brake disc Replacement brake disc Measurement of wear Chain hook Repl...

Страница 22: ...www unicraft de...

Отзывы: