Intended use

When using the gantry crane make sure that the load is 
correctly and safely connected to the chain and that it is 
securely connected to the gantry crane.

Stopping under a suspended load should be avoided 
as loose objects may fall off at any time.

The transport and lifting of persons is prohibited. It is not 
permitted to enter the lifting device.

2.6 Safety information for operating personnel

It is necessary to refrain from any work that affects the 
safety of the gantry crane.

The operator must also ensure that no unauthorized per-
sons work with the gantry crane. The operator is obliged 
to inspect the gantry crane at least once before use 
(daily) for externally visible damage and defects. Any 
changes that impair safety must be reported immedi-
ately. Damaged or heavily worn parts must be replaced 
immediately.

The operator has to ensure that the gantry crane is al-
ways operated in perfect condition. If necessary, the 
operator must oblige operating personnel to wear pro-
tective clothing, etc.

In principle, no safety equipment may be dismantled or 
taken out of operation (already here is concretely to 
warn of impending hazards, so for example on imminent 
severe bruising, loss of sight, danger to life). If the di-
sassembly of safety equipment is required during set-
up, repair and maintenance, the safety equipment must 
be reassembled immediately after completion of the 
maintenance or repair work.

2.7 Safety marking on the gantry crane

The following safety signs are attached to the gantry 
crane (Fig. 1), which must be observed and followed.

Fig. 1: Safety labels 

The safety labels attached to the portal crane must not 
be removed. Damaged or missing safety signs can lead 
to malfunctions, personal injury and property damage. 
They are to be replaced immediately.

If the safety signs are not immediately recognizable and 
comprehensible, the gantry crane should be taken out 
of operation until new safety signs have been attached.

2.8 Checks

The gantry crane is a testable suspension. It must be te-
sted by a qualified person for operational safety before 
commissioning for the first time and, if required, at inter-
vals of no more than 1 year in accordance with the pro-
visions of the German Industrial Safety Ordinance and 
DGUV Rule 100-500, Chapter 2.8. 

3

Intended use

The gantry crane is used exclusively for loading and un-
loading, for assembly, repair or storage work on level, 
smooth and sufficiently load-bearing floors in work-
shops and halls. The specified maximum load must not 
be exceeded. The gantry crane must be secured 
against rolling away.

The gantry crane may only be operated by instructed 
persons.

Proper use also includes compliance with all information 
in this manual. Any use beyond the intended use or 
otherwise is considered misuse. The lifting of persons is 
strictly prohibited. Use of the device in other areas is 
considered improper use.

For structural and technical changes to the gantry 
crane, the company Stürmer Maschinen GmbH assu-
mes no liability. Claims of any kind due to damage due 
to improper use are excluded. 

3.1 Predictable misuse

With the gantry crane, if the intended use is observed, 
no reasonably foreseeable misuse is possible which 
could lead to dangerous situations with personal injury.

3.2 Residual risks

Even if all safety regulations are adhered to, the residual 
risks described below remain with the operation of the 
gantry crane.

All persons working with the gantry crane must be 
aware of these residual risks and follow the instructions 
that prevent these residual risks leading to accidents or 
damage:

- During operation there is a risk of crushing the up-

per and lower limbs.

Содержание 6172100

Страница 1: ...PK 1 PK 1 Operating Instructions Mobile gantry crane PK 1...

Страница 2: ...ns and error Contents 1 Introduction 3 1 1 Copyright 3 1 2 Customer service 3 1 3 Limitation of liability 3 2 Safety 3 2 1 Symbol explanation 3 2 2 Obligations of the operating company 4 2 3 Requireme...

Страница 3: ...ned from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes in these operating instructions wer...

Страница 4: ...ond to the cur rent status of the regulations and must adapt these if necessary The operating company must unambiguously reg ulate and determine the responsibilities for instal lation operation troubl...

Страница 5: ...r personal protec tive equipment while performing different tasks on and with the machine which are indicated in the individual paragraphs of these instructions The personal protective equipment is ex...

Страница 6: ...rsonal injury and property damage They are to be replaced immediately If the safety signs are not immediately recognizable and comprehensible the gantry crane should be taken out of operation until ne...

Страница 7: ...of polystyrene PS Deliver these substances to a collection point for recyclable materials or to the waste disposal company which looks after your region 5 3 Storage The Mobile gantry crane should be l...

Страница 8: ...shers 6 spring washers 7 and nuts 8 Proceed with the other chassis carrier and verti cal carrier as well Step 6 Slide the vertical support 21 into the vertical support 23 and insert one of the pins in...

Страница 9: ...the ground on which the gantry crane stands is level level and sufficiently stable Never attach a load to the gantry crane which may slip or whose parts are not firmly connected Never use the gantry...

Страница 10: ...vers fig 3 1 2 Insert the locking bolt into the upper hole Fig 5 1 Lift the carrying hook with the upper securing bolt Fig 5 3 Lift the height adjustment lever slightly to loosen the weight on the low...

Страница 11: ...DGUV Rule 100 500 are previous practice and comply with the rules of technology The test is essentially a vi sual and functional test It covers the examination of the condition of the components and...

Страница 12: ...em No and year of manufacture on the type plate fixed to the Mobile gantry crane Example The castor for the gantry crane PK1 must be ordered The castor has the number 27 in the spare parts dra wing 1...

Страница 13: ...pare parts drawing In case of service the following drawing shall help to identify the necessary spare parts If necessary send a copy of the parts drawing with the marked components to your authorised...

Страница 14: ...Year of manufacture 20_____ complies with all relevant provisions of the above mentioned directive as well as the other applied directives below including their applicable modifications at the time o...

Страница 15: ...Notes PK 1 Version 1 03 15 14 Notes...

Страница 16: ...www unicraft de...

Отзывы: