background image

01865 767676

[email protected]

www.unicol.com

3

Revised 15/12/20

STEP 4

Utilising the tag locks and fixing pack provided with 
your mount, attach the arms to the back of your 
screen.

Ensure the arms are the correct way up before 
tightening - the ‘hook’ part of the arm should be at 
the top.

STEP 1

Using the 4 ceiling mounting slots, as shown 
above, determine where you want to install your 
mount, mark it and fix into position.

Please consider cabling and ceiling fixings prior to
installation. Please check surface is capable of 
supporting 5x the combined solutions weight.

STEP 2

Slide all cabling through the column and through 
the gap in the ceiling plate socket. Being mindful 
of the cables, slide the column into the socket, 
ensuring that the two holes either side align with 
those on the mount. Using the through bolt, secure 
the column into place and tighten the two grub 
screws at the rear.

STEP 3

Slot cabling through the suspension mount socket 
and slide the mount over the column, ensuring 
that the two holes either side align with those on 
the column. Like in Step 2, slide the through bolt 
through the holes and secure. Tighten the two grub 
screws at the rear.

Содержание KP Kit

Страница 1: ... the maximum load capacity Please also layout all components to ensure that you have all of the required parts before proceeding see BOM list on following page Use of this product for anything other than its specified use may result in failure or personal injury This product is intended for indoor use only We recommend using a qualified trades person for installation Use an assistant or lifting eq...

Страница 2: ... 1 2 DESCRIPTION QTY 1 Length of Column 1m 2m or 3m 1 2 CP1 Standard Ceiling Plate 1 3 Single Sided Suspension Mount 1 4 Universal Tilting Mount Arms 2 5 Alternative Suspension Mount 6 Alternative Ceiling Plate TOOLS REQUIRED 1 Pozi Head Screwdriver 2 3 16th Allen Key 3 13mm Spanner 1 2 3 4 5 6 ...

Страница 3: ...llation Please check surface is capable of supporting 5x the combined solutions weight STEP 2 Slide all cabling through the column and through the gap in the ceiling plate socket Being mindful of the cables slide the column into the socket ensuring that the two holes either side align with those on the mount Using the through bolt secure the column into place and tighten the two grub screws at the...

Страница 4: ...cure the column into place and tighten the grub screws at the front of the socket Continue from Step 3 STEP 3 Using another team member lift the screen up and gradually offer it up to the back plate Gently tilting the screen forward hook the arms over the lip of the back plate and lower once in position Centre the screen horizontally by sliding from side to side until you are happy with the positi...

Отзывы: