
27
Technical features and dimensions
ENGLISH
(*) Optional
External probe connection (*)
- Set up on terminal board, BCm
(Y2 6-7).
Safety
connection
10-
F
L
1
1
-
IN
A
IL
Y4
1
2
3
4
1
2
3
1 2 3 4 5 6
Y3
Y2
12 11 10 9
8
7
6
5
4
3
2
1
0 1
2
3
4
5
6
7
8
9
9
8
10 11 12 13 14
2
1
3
4
5
6
7
Jp2
9-
T
A
SE
10-
F
L
1
1
-
IN
A
IL
Y4
1
2
3
4
1
2
3
1 2 3 4 5 6
Y3
Y2
12 11 10 9
8
7
6
5
4
3
2
1
0 1
2
3
4
5
6
7
8
9
9
8
10 11 12 13 14
2
1
3
4
5
6
7
Jp2
9-
T
A
WH
R
+24V
BK
G
10-
F
L
1
1
-
IN
A
IL
Y4
1
2
3
4
1
2
3
1 2 3 4 5 6
Y3
Y2
12 11 10 9
8
7
6
5
4
3
2
1
0 1
2
3
4
5
6
7
8
9
9
8
10 11 12 13 14
2
1
3
4
5
6
7
Jp2
9-
T
A
WH
R
+24V
BK
G
FL
INAIL safety connections
FL Flow switch connection (*)
- remove the jumper and connect the cables as indicated
between
(Y2 11 and terminal board M2).
- remove the jumper and connect the cables as indicated
between
(Y2 10 and terminal board M2).
Содержание SPK 1000
Страница 35: ...35 Maintenance instructions ENGLISH PAGE LEFT BLANC INTENTIONALLY ...
Страница 42: ...42 ...
Страница 43: ...43 ...