![Unical SPK 1000 Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/unical/spk-1000/spk-1000_installation-and-maintenance-instructions-manual_839290022.webp)
22
3.8 - CONDENSATE DRAIN
H =
Siphon head
Capacity conditions 0 and max fan Head
WKVV 1000
H = 160 mm
FLOOR
OF THE
CENTRAL
THERMAL
HOLE
FILLING
SIPHON
The boiler, during the combustion process, produces conden-
sation that, through pipe “A”, flows into the trap.
The condensation that forms inside the boiler flows into a suitable
drain via pipe “B”.
Danger!
Before commissioning the appliance:
- check that the trap is assembled
of the siphon (* H = XXX mm)
- fill the trap and check that
the condensation is drained properly
If the appliance is used with an empty conden-
sation drain trap, there is an intoxication hazard
due to the release of exhaust gasses.
The connection between the appliance and the do-
mestic waste system must be made in compliance
with the specific reference standards.
If you do not want to or cannot create a base-
ment, the boiler can be mounted at ground level
and a bulb holder XXX deep can be made to
house the siphon.
BoILEr room fLoor
AT
CONDEN-
SATE
DRAIN
The upper generator
of the drain pipe
must not be higher than
the bottom of the pan.
NOTE!
Further details in the section
‘‘Technical Information’’ on the boiler
page of the www.unicalag.it website
Содержание SPK 1000
Страница 35: ...35 Maintenance instructions ENGLISH PAGE LEFT BLANC INTENTIONALLY ...
Страница 42: ...42 ...
Страница 43: ...43 ...