33
Instructions for the installer
°C
OK
1
2
1
2
>1s
+
°C
°C
°C
BUS ID
1/2/11/Mod
Run
2
1
31
42
11
41
12
13
32
3.20 - PANEL INSTRUMENTS MODULATING
CASCADE cod. 37900
11 switch with indicator light
12 Power Burner
13 Power plant pump P1 (waterfall)
31 Safety thermostat
With the switch 11 , place under tension the framework and
equipment connected to it.
The switches 12 and 13 , control the burner and the pump P1
in the case of boiler cascade
The temperature controller adjusts the temperature Boiler No.
2: To achieve this, the thermostat will be located in scale up
pos. 32 .
The possible modulation of the burner will be managed by the
thermoregulatory
On the boiler power line control panel must be provided with
a switch fuses protection
To use the instrument panel, see instruction manual for the plant manager.
As for the practical schemes of connection and operation, see documentation provided in the instrument
panel code. 37900
32 thermostat operation
41 main fuse
The boiler sensor included in the supply.
fig. 17
Содержание INOXIA GJ 1000
Страница 1: ...INOXIA GJ INSTALLATION AND SERVICING MANUAL 00335290 1st edition 04 11 ...
Страница 21: ...21 Instructions for the installer fig 12 5 24 4 8 10 12 13 6 3 1 2 7 23 20 14 19 17 21 18 1 2 11 9 16 12 15 ...
Страница 54: ......
Страница 55: ......