
1
Contents
0.
Preface··································································· Safety from 1 to 5
Contents····················································································· P1
1.
Oil Filtration System’s Feature ··················································· P2
2.
Specifications ·········································································· P2
3.
External View. ··········································································P3
4.
Circuit Diagram(Oil inflow system diagram) ································· P5
5.
Installation··············································································· P6
6.
Preparation for operation and supply ·········································· P6
7.
Operation ················································································ P7
8.
Shut down ··············································································· P7
9.
Maintenance and Check up ························································ P7
10.
Replacement of Elements ·························································· P9
11.
Replacement of Oil ··································································· P9
12.
Failure and countermeasure ······················································ P10
13.
Anti Chemicals ········································································· P11
14.
Disposal ·················································································· P12
15.
Assurance ··············································································· P12
16.
Closing ··················································································· P12
UFO/UFW
Check sheet of the current situation (For maintenance/repair)