background image

 

 
 

Содержание SPU

Страница 1: ...Measuring Unit SPU Instruction Manual Components Division ULVAC Inc http www ulvac co jp This manual is for this unit units of the following serial numbers S N 00001 and higher Read this manual befor...

Страница 2: ......

Страница 3: ...ty Symbols Safety symbols are used throughout this instruction manual to call the operator s attention to safety The terminology used in safety symbols is classified below Indicate status of urgency o...

Страница 4: ...ly to a grounded vacuum chamber Use a conductive metal clamp on the NW flange If this unit is not correctly connected it will not only show the wrong pressure there is a risk of damage to this unit an...

Страница 5: ...zation of moisture or organic matter pressure accuracy and response speed will be affected Review installation locations and methods so that fouling does not occur Moisture and fouling The ambient tem...

Страница 6: ...ry There is a risk of damage if this unit is transported without packaging or transported attached to the equipment Transportation packaging When disposing of this unit please follow all local laws an...

Страница 7: ...3 2 LEAK TEST 6 4 HANDLING PRECAUTIONS 7 4 1 PRECAUTIONS RELATED TO THE USAGE ENVIRONMENT 7 4 2 PRECAUTIONS RELATED TO USAGE 7 4 3 ATTACHING THIS UNIT 7 4 3 1 This unit attachment environment 7 4 3 2...

Страница 8: ...e Measurement value output Output by serial communication LED display POWER ERROR LED Gauge head material Filament Pt Other CuZn Ni plating Kovar glass Ni SnSb Gauge head withstand pressure 2x10 5 Pa...

Страница 9: ...re 2 1 SPU controller section explanatory drawing Name symbol Function I O connector The I O connector for the power supply and signals RJ 45 jack connector Gauge head clamp The clamp to hold and lock...

Страница 10: ...igure 2 2 SPU LED explanatory drawing Name symbol Function POWER ERROR LED On Operating normally Flashing Error such as a filament break this unit is malfunctioning Off Power off this unit or the SH2...

Страница 11: ...ctor pin assignment diagram Terminal number This unit Signal direction Connection destination 1 Power supply 5 VDC SH2 Multi ionization gauge 2 GND 3 Power supply 5 VDC 4 Communication terminal 5 Comm...

Страница 12: ...e filament in the gauge head Power on Perform a leak test when the gauge head is replaced and attached There is a possibility of leaking from impacts to the pin section Leak test 3 1 Attaching the gau...

Страница 13: ...igure below the gauge head may leak from the constrictive clamp Insufficiently inserted Leak occurs Fully inserted 3 2 Leak test When the gauge head is attached we recommend performing a leak test in...

Страница 14: ...um chamber and protect this unit so it is not exposed to these gases as much as possible by using this unit with the isolation valve closed Use in a CVD gas atmosphere The ambient temperature of the g...

Страница 15: ...is thin at 25 m so avoid use in a location with a large amount of vibration as much as possible The biggest cause of filament breaks is from mechanical shock so use caution regarding the installation...

Страница 16: ...asurements are dependent on the type of gas An environment with a large quantity of fouling Assume internal gauge head contamination Replace the gauge head Pressure does not reach 0 4 Pa or lower even...

Страница 17: ...fer Cause Action The gauge head is dirty Sensitivity has dramatically deviated Replace the gauge head with another gauge head and check the phenomena If there is no problem with the other gauge head t...

Страница 18: ...rature of the gas molecule after the collision If the energy transfer on the filament surface was complete 1 The value of has complicated properties that change according to geometric roughness the pr...

Страница 19: ...5 3 7 7 5 1 4 3 6 7 4 3 5 3 4 7 4 1 2 9 3 7 10 9 3 1 5E 1 9 4 8 5 1 3E 1 8 0 1 1E 1 9 8 7 4 5 6 7 2 20 1 7E 1 2 7E 1 2 0E 1 1 9E 1 2 9E 1 1 7E 1 2 1E 1 2 1E 1 1 5E 1 1 2E 1 1 9E 1 50 3 5E 1 6 0E 1 5...

Страница 20: ...r to the local ULVAC representatives for repair Return charge shall be paid by Buyer Disclaimer 1 Failure occurred after expiration of warranty period 2 Failure caused by force majeure such as fire st...

Страница 21: ...contents of hazardous substances or elements Name of parts Hazardous substances or elements Pb Hg Cd Cr6 PBB PBDE Printed Circuit Board X O O O O O Chassis O O O O O O Connector O O O O O O Label O O...

Страница 22: ...15 9 Dimensions 9 1 SPU dimensions 40 51 113 82 30 R40...

Страница 23: ...16 9 2 Gauge head dimensions 18 NW16 96 102 5...

Страница 24: ...17 9 3 Unit cable SPU P1 RJ 45 P2 RJ 45 WIRE COLOR 1 1 WHITE ORANGE 2 2 ORANGE 3 3 WHITE GREEN 6 6 GREEN 5 5 WHITE BLUE 4 4 BLUE 7 7 WHITE BROWN 8 8 BROWN Shell Shell DRAIN...

Отзывы: