Issued/Revised:
32
DC-SAPLING w/ROOF
2
1
3
4
2
5
1
CM
0
INCH
0
10
9
6
11
14
8
15
7
12
13
4
3
6
5
02/02/16
800.458.5872
www.ultraplay.com
STEP 4
SEEDLING DECK B
w/6 INSERTS
(02-08-0006)
IMPORTANT:
ORIENTATION OF SQUARES
IN DECK IS CRITICAL.
LOWER POST, 22 11/16" LG
(02-08-0152)
1. Slide Seedling Deck B onto Lower Posts.
IMPORTANT:
Orientation of squares in deck is critical.
Содержание DC-SAPR
Страница 1: ...Issued Revised 02 02 16 DC SAPLING w ROOF 800 458 5872 www ultraplay com 1 MODEL DC SAPR...
Страница 2: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 15: ...Issued Revised 02 02 16 TOOLS REQUIRED 800 458 5872 www ultraplay com 14...
Страница 18: ...Issued Revised 02 02 16 ELEVATION VIEW 800 458 5872 www ultraplay com 17 162 1 4 in 109 1 2 in ELEVATION VIEW...