background image

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ 

CAREFULLY

- Most buildings are pre-treated with a factory base coat for protection 
during storage and transit. We recommend that you treat your new 
building as soon as possible after assembly using a wood preservative 
treatment. Apply in accordance with the manufacturers instructions.
- Timber is a natural material. It will shrink and swell as a result of 
varying moisture content.
- Please keep all plastic bags and small parts away from children
- This product must be built on a solid level base and at least two 
metres away from any structure or obstruction.

Warnings

 

-This product is for outdoor use only.
-This product is intended for use by children of up to age 10 years.
-Only for domestic use

Technical Help line:

7777 089

  8.30 am and 5.00 pm  Monday to 

 

0333 

Friday.

In line with your statutory rights, please check all parts prior to 
assembly, as assembly of damaged parts may be deemed to be 
acceptance and this may affect the remedies you are entitled to. If the 
product is not constructed in accordance with the instructions, or is 
altered in anyway (e.g. painted), the manufacturer cannot be held liable 
for any resulting damage

PEACH PLAYHOUSE

Fixing Pack (PH1FPV2)

This fixing pack is used for several products. 
There may be additional fixings.

FELT NAIL

Not to Scale

46

 2

 16

REQUIRED TOOLS 

(NOT SUPPLIED)

POZI DRIVE SCREWDRIVER

DRILL

TAPE MEASURE

HAMMER

Important : 

Assembly of this 
product requires 

a minimum of two

 

adults only

.

PH1 Parts list:

 14

C

Issue 0414

Attention: 

This instruction is 

used for several 

different 

buildings. Please 

quote from the 

correct parts 

sheet when 

ordering 

replacements.

MUST PRE DRILL

SPIRIT LEVEL

D

F

A

G

H

M

E

 K

N

L

40120530PAIIDT

(Strip 530mm ) Qty 2

PH1PE

(Plain End) Qty 1

12566908

(Roof Sheet) Qty 2

PH1PP

(Plain Panel) Qty 2

PH1DR

(Door) Qty 1

PW530250

(Window) Qty 2

28280100CRCTA2DTR

(Block 100mm) Qty 1

SBB80120694PAI67DT

(Barge Board) Qty 2

40121024PARDTR

(Corner Strip 1024mm) Qty 4

28281172CRCTPTR

(Batten 1172mm Pressure Treated) Qty 4

28281252CRCT

(Batten 1252mm) Qty 2

85069

Felt Qty 2

BLACK SAND FELT

 

Hinge 

25mm Screw

50mm Screw

25mm Screw (black)

 1

10

30mm Screw

24

PH1

Instruction Reference

Magnetic

 Catch and Plate

PH1DEV2

(Door Panel) Qty 1

B

Q

15120250PARDTR

 (Glazing Strip) Qty 8

P

SHARP KNIFE

Panel Pins

 50

28280100CRCTDTR

(Door Handle 100mm) Qty 1

 J

R

Biocidal Product Regulation (EU 528/2012) Article 58 Information

This article contains timber treated with Celcure AC-500, incorporating biocidal products 
to give p

rotection against wood destroying insects & wood rotting fungi. 

Contains:

 Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), 

Boric acid, Benzalkonium chloride.

Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting 
treated or untreated wood. Dispose of off-cuts responsibly – do not burn.

Warning. Only for domestic use 

EN71 COMPLIANT

Slipping, Tripping

 & Falling

48120694PARA1DTR

(Barge Board) Qty 2

 I

O

28281172CRCT

(Batten 1172mm ) Qty 1

28280694CRCTA1

(Batten 694mm ) Qty 2

40120586PAIIDT

(Strip 586mm ) Qty 2

Содержание PEACH PLAYHOUSE PH1

Страница 1: ...sembly of this product requires a minimum of two adults only PH1 Parts list 14 C Issue 0414 Attention This instruction is used for several different buildings Please quote from the correct parts sheet when ordering replacements MUST PRE DRILL SPIRIT LEVEL D F A G H M E K N L 40120530PAIIDT Strip 530mm Qty 2 PH1PE Plain End Qty 1 12566908 Roof Sheet Qty 2 PH1PP Plain Panel Qty 2 PH1DR Door Qty 1 PW...

Страница 2: ...Fix an 1172mm batten pressure treated to the bottom of each panel making sure that it is flush on all sides Fix each batten in place using 2 x 50mm screws B A A C M Place the remaining 1172mm batten so that it bridges the door end and plain end at the top as illustrated Fix this in place using a 50mm screw at each end screwing at an angle Place a corner strip to each corner making sure that it is ...

Страница 3: ...t be no less than 12mm The gap on the opening side must be less than 5mm 5 Place the handle half way up the door against the edge of the board Position the magnetic plate on the reverse of the door opposite the handle Use 2 x 25mm screws to fix both the plate and handle to the door screwing from inside 6 Place the door block against the front and in line with the side of the door end Making sure t...

Страница 4: ...the felt nails provided spaced at 150mm intervals Place each roof section on to the building so that they are in line with the apex Fix the roof sections in place using 3 x 25mm screws for each end screwing into the panels framing Further secure the roof using a 30mm screw through the roof into the centre of the side panel framing Maintenance After assembling the building we recommend that you tre...

Отзывы: