8
INSTALLATION: METHOD 1
SPARTAN
7. Raise the Spartan unit into the pre-cut hole from the underside into position and line up with the pre-built
timber frame.
8. Ensure the bottom of the unit is flush with the ceiling plaster.
9. Secure the unit in place using the coach screws and through the mounting holes.
NOTE
Ensure the supporting timber frames are in parallel. When using this method of installation,
the lift’s frame can be pushed out of square if the screws are not tightened equally or the
supporting frames are not in parallel.
A
DETAIL
A
TIMBER FRAME
CEILING PLASTER
POSITION FRAME SUCH THAT
TRIM PANEL IS FLUSH WITH
CEILING PLASTER
COACH SCREWS, FIX TO
TIMBER FRAME