8
INSTALLATION
MERCURY SLIM
7.
Cover the bolts with the supplied end caps.
8.
Route the AV cables into the lift as per diagram on page 13 (cable management).
9.
Expose the IR eye in a suitable position to achieve line of sight to the remote.
10.
Expose double sided tape on loose corflute dust cover and fit to frame.
Fasten 4 Coach
Screws into Ceili ng
Joi sts through holes in
the framework.
Cover coach
Screws with white
Plas
�
c end caps.