7
INSTALLATION
MERCURY SLIM
INSTALLATION
1.
Cut 8 mm threaded rods to suit the distance from
the slab/hanger rails to the Lift fixing points on the
top corners of the Mercury Slim.
2.
Fix the pre-cut threaded rod to the slab or ceiling
hanger rails as shown below.
3.
Fit one M8 nut and washer to each threaded rod.
4.
Fit one M8 nut and washer 100 mm up from the
bottom of the threaded rod.
5.
Raise the Mercury Slim unit into the pre-cut hole
from the underside. Fit the threaded rod through
the top frame of the lift. Fit nuts and washers to suspend the lift.
6.
Adjust nuts until the lower frame sits 1-2mm above the plaster underside. Screw a minimum of four
M8 x 50 coach screws through the fixing holes on the inside frame of the Lift, into the pre-built
timber support frame.
M8 All Thread
Length as required with
Nuts and washers.