WARNING: To prevent damage to the control valve regulator during the initial
turn-on of gas, it is very important to open the manual shut-off valve very slowly.
After the initial gas turn-on, the manual shut-off valve must remain open except
during pressure testing as outlined in the above steps or when necessary during
service maintenance.
9
STACKING INSTRUCTIONS
The following instructions should be followed when
stacking more than one unit.
Single Oven (or Bottom) Cart Install:
1. Remove door, conveyor, and finger assemblies.
2. Unbolt unit from shipping crate (2 bolts).
3. Turn unit on front as shown.
4. Slide legs into stand shelf and thread legs into
bottom of oven.
5. Install casters into bottom of legs. Place casters
with brakes to the front.
6. Position shelf as desired and fasten to legs.
7. CAREFULLY lift oven upright.
Stacked Oven Install Preparation:
1. Remove door, conveyor, and finger assemblies.
2. Unbolt unit from shipping crate (4 bolts).
3. Turn unit on front as shown.
4. Remove top of lower oven (4 screws total, 2 each
front and rear) and bolt to stacked oven base using
5/8 - 11 bolts (4 each, included).
5. Place top oven on lower unit and re-attach with
screws for top of lower oven.
6. Use restraint on lowest oven to prevent any high
loads that could tip the oven stack.