Page
11
of
28
Issue 5: 07/01/2021
8.3 Cable management system
Cable management fixings are located on each side of the mattress underneath the flap of the cover.
The mains power cable should be secured through the cable management fixing as follows:
Locate each cable management fixing.
If necessary, open the press studs.
Run the mains power cable along the side of the mattress securing each fixing loop around
the cable using the press studs
.
8.4 Connecting mattress to the Pump
Remove the cover of the air pipe connector and connect the air pipe
connector to the Pump and then ensure that the air tubes are free from
any kind of obstruction, and are not kinked.
Plug the power cable into a suitable electrical
socket and switch ‘ON’
using mains power switch found at the side of the Pump. All indicators
on control panel will light up
.
The
Standby
indicator on the control
panel will light up.
Push the
Operate
button and the system will start inflation and the
Auto-Firm
indicator will flash.
Once the mattress is fully inflated, you can then set the mattress to the
appropriate setting suitable for the patient.
Caution: The Pump must only be connected to the mattress recommended by the
manufacturer. Do not use it for any other purpose.
Note: Ensure that the CPR valve is set to the closed position.
Содержание Tamora III Advance
Страница 2: ...Page 2 of 28 Issue 5 07 01 2021...
Страница 27: ...Page 27 of 28 Issue 5 07 01 2021 Notes...