53
3. CALIBRATING
To ensure that the Z stage moves smoothly and accurately, you now need to calibrate the square flanged bearings.
1. Move the Z stage cap all the way up and tape it to the top panel to keep it out of the way. Fig. 122.
2. Place the roll of blue tape in the middle of the bottom panel.
3. Grab the base plate on both sides at the back and move it down until it lays flat on the roll of tape. Fig. 123.
4. Tighten the eight M4x10 bolts of the square flanged bearings with the 2.5 mm hex key. Alternate between the left
and right bearing. Fig. 124.
Make sure the Z stage stays in the same position while tightening the bolts.
5. Move the Z stage up and down to check if it moves smoothly.
6. Loosen the Z stage cap from the top panel and place it into the aluminium base plate. Fig. 125.
7. Place two hex nuts in the T-slots of the Z stage cap and secure the cap with two M3x12 bolts. Fig. 126.
123
122
125
124
126
Содержание ORIGINAL+
Страница 1: ...ASSEMBLY MANUAL Original manual V3 0 2016 Ultimaker ULTIMAKER ORIGINAL...
Страница 71: ...71 1 MAIN FEEDER HOUSING For the assembly of the feeder housing you will need the following parts Fig 186 186...
Страница 82: ...82 SPOOL HOLDER PARTS NEEDED Wooden parts 11B short Wooden parts 11B long Wooden parts 11C 2 2 6 Laser pack 232...
Страница 96: ...96 COVER PARTS NEEDED Electronics cover 1 Laser pack M3x20 bolt Spacer 8 mm 4 4 1206 1502 Nuts bolts pack 270...
Страница 99: ...www ultimaker com...